Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

Blog

  • 5-Ton Gantry Crane Purchasing: Define the Complete Supply Scope

    5-Ton Gantry Crane Purchasing: Define the Complete Supply Scope

    Selection guide

    5-Ton Gantry Crane Purchasing: Define the Complete Supply Scope

    An equipment offer should identify the gantry arrangement and the work required at the destination. Provide the load and site brief, then clarify support, power, installation and handover responsibilities before ordering.

    Henan Mine CraneSelection guide · Updated 2026Crane selection, project scope and operating requirements
    Henan Mine Crane 5 Ton Overhead Crane
    Henan Mine Crane 5 Ton Overhead Crane
    Project planning notes

    Key points for this crane project.

    1. What Is a 5 Ton Gantry Crane?
    2. 01 · Single-Girder Full Gantry Crane
    3. Selection Considerations
    Read the technical guide

    What Is a 5 Ton Gantry Crane?

    The bridge is supported by legs that transfer operating forces to ground-level wheels, rails, foundations or an approved floor system. An electric hoist or trolley moves across the bridge, while powered end carriages move the complete gantry along its travel path.

    The capacity rating applies to the complete suspended load at the hook. Load weight, center of gravity and lifting-point arrangement therefore belong in the purchasing specification.

    A short-span maintenance gantry with occasional lifts differs materially from a long-span outdoor crane handling fabricated steel throughout two production shifts. Bridge structure, hoist duty, speeds, wheel loads, wind controls, corrosion protection, runway design and electrical supply must match the application.

    For general industrial service, a single-girder electric-hoist gantry is usually the most economical starting point. A double-girder configuration becomes relevant where span, hook approach, lifting height, duty, stiffness, maintenance access or process equipment justify the additional structure. Semi-gantry and offset-leg arrangements solve site-specific access and building-interface constraints.

    01 · Single-Girder Full Gantry Crane

    One box or rolled-section bridge girder carries an electric wire-rope hoist. The arrangement controls self-weight and equipment cost for workshops, yards, fabrication and general material transfer.

    02 · Double-Girder Gantry Crane

    Two bridge girders support a hoist or top-running trolley. Greater bridge stiffness, improved hook height and maintenance access support longer spans, higher duty and process-oriented operation.

    03 · Semi-Gantry Crane

    One end travels at an elevated building runway while the opposite leg travels at floor level. The configuration serves a defined production zone without installing two ground runways.

    04 · Truss Gantry Crane

    A lattice bridge structure reduces exposed area and structural mass for selected outdoor or transportation-sensitive projects. Connection, corrosion and inspection requirements remain part of the engineering basis.

    05 · L-Type or Offset-Leg Gantry Crane

    An offset leg and cantilever can improve side loading, truck access and material transfer beyond the runway. Wheel reactions and lateral stability require project-specific verification.

    They are compact lifting frames rather than automatic substitutes for a powered industrial gantry. Travel under load, floor condition, caster rating, permitted motion, hoist compatibility and assembly procedure must be confirmed from the specific portable-crane design.

    For repeated material flow across a workshop or yard, a rail-mounted powered gantry normally provides better travel control, defined alignment, longer coverage and easier integration with pendant or radio control.

    Selection Considerations

    A technically complete purchase begins with the handling process and operating site. The following inputs determine configuration, structural loads, mechanism duty, protection and commercial scope.

    Record maximum payload, normal payload, attachment, spreader, sling and every component carried below the hook. Confirm center of gravity and lifting points.

    State rail-center span, total crane travel, cantilever length, pickup zones, placement zones, end approach and side-loading requirements.

    Define lowest pickup, highest placement, rail elevation, leg clearance, bridge clearance, load height, rigging depth and required hook approach.

    Provide lifts per hour, shifts, annual hours, average load, full-load frequency, travel distance and any production-critical operating cycle.

    Identify indoor slab, outdoor foundation, rails, embedded plates, drainage, settlement limits, runway straightness and allowable wheel reactions.

    Specify lifting and travel speeds, low-speed range, pendant or radio control, variable-frequency drives, positioning needs and multiple-crane interaction.

    Declare temperature, rain, snow, wind, dust, humidity, corrosive exposure, hazardous classification, washdown and outdoor storage conditions.

    Define destination, power supply, governing requirements, documentation language, inspection authority, installation boundary and load-test responsibility.

    5 Ton Gantry Crane Configurations Compared

    ConfigurationLifting ArrangementTypical ApplicationCommercial Advantage
    Single-girder full gantryElectric wire-rope hoist below one girderGeneral workshops, yards, precast and fabricationLower structural mass and controlled equipment cost
    Double-girder full gantryHoist or trolley supported by two girdersLonger spans, higher duty and process-oriented handlingGreater stiffness, improved hook height and service access
    Single-girder semi-gantryOne elevated runway and one floor-running legProduction zones beside an existing building supportReduced ground-runway footprint and clear access on one side
    Truss gantry craneLattice bridge with full or semi-gantry legsOutdoor yards and transport-sensitive project sitesLower exposed area and structural mass in selected layouts
    Portable steel gantry frameFixed or adjustable beam on casters or V-groove wheelsLocalized maintenance and occasional liftsLow infrastructure requirement and repositioning flexibility

    Double-girder, semi-gantry, truss and offset-leg designs should solve a defined span, clearance, duty, environment or material-flow requirement.

    Technical Specification Framework

    The following framework establishes the minimum technical information for a comparable proposal. Published product-family ranges identify available engineering coverage; final parameters depend on the selected structure and approved site data.

    Specification ItemEngineering RequirementProcurement Control
    Rated capacityGross suspended load includes every below-hook componentLoad list and center of gravity approved before design release
    Gantry structureBox, rolled or lattice structure selected from span and dutyGeneral arrangement identifies rigid leg, flexible leg and cantilever geometry
    SpanMeasured between runway rail centersSite survey and operating clearances govern final value
    Lifting heightHook travel from lowest pickup to highest required positionAttachment depth and below-rail clearance included
    Working classSelected from load spectrum and operating frequencyCrane and hoist mechanism classifications stated in proposal
    Hoisting mechanismSingle or dual speed, variable-frequency optionHoist arrangement matched to headroom, duty and maintenance access
    Crane and trolley travelVariable-frequency control available for smoother accelerationWheel, motor, brake and gearbox basis included
    ControlEmergency stop and operating indications integratedControl station, travel direction and restricted zones defined

    Supply Scope and Quotation Comparison

    Scope PackageTypical ContentRequired DefinitionCommercial Check
    Gantry crane equipmentBridge girder, legs, lower beams, end carriages, hoist or trolley, travel drives and required access componentsApproved arrangement, capacity, span, lift and dutyStructural connections, fasteners and assembly items listed
    Electrical and controlsPanels, pendant or radio, limit switches, alarms, cabling and crane-mounted electrificationVoltage, frequency, control method and enclosure protectionRunway power feed and site cable excluded or included explicitly
    Runway and rail systemRails, clips, base plates, stops, conductor supports and alignment components where contractedTravel length, rail type, gauge and allowable tolerancesCivil foundations and embedded items assigned by party
    Outdoor safety equipmentRail clamps, storm anchors, wind-speed monitoring, wheel chocks and weather protection where requiredOperating wind and parked-crane design basisAutomatic and manual devices identified separately
    DocumentationDrawings, reaction data, manuals, inspection records, electrical diagrams and packing listLanguage, format, approval stages and handover quantityStatutory and third-party documents defined before order
    LogisticsExport packing, inland transport, ocean freight, insurance and destination handling as contractedIncoterm, destination port, package limits and route restrictionsTaxes, duties, unloading and local storage allocated clearly
    Installation and commissioningMechanical assembly, rail alignment, electrification, settings, functional checks and operator familiarization where contractedSite readiness, work permits, access equipment and power availabilityTravel, accommodation, local labor and lifting equipment stated
    Testing and acceptanceFactory checks, site commissioning, proof load and operational acceptance as specifiedTest weights, witness authority, procedure and acceptance criteriaResponsibility for test load and certified weights identified

    A low equipment figure can exclude the electric hoist, powered trolley, rails, foundation work, conductor system, freight, erection or load testing. Commercial comparison should normalize every quotation to the same technical and delivery boundary.

    Applications and Working Conditions

    Fabrication Yard

    Moves frames, beams, welded assemblies and production fixtures between fabrication, inspection and dispatch zones. Side loading and cantilever reach may be important.

    Precast Concrete Operation

    Handles molds, reinforcement cages, inserts and approved precast components. Outdoor duty, load geometry, rigging and frequent travel require early definition.

    Workshop Maintenance

    Removes motors, gearboxes, pumps, dies and machine modules where an overhead runway cannot be installed or the lifting area changes over time.

    Warehouse and Logistics Yard

    Transfers machinery, bundled materials and industrial goods between storage positions and trucks. Clear width, stacking height and traffic segregation control layout.

    Equipment Assembly

    Supports staged assembly, alignment and testing of industrial equipment. Low-speed control, hook approach and radio visibility can be more important than maximum speed.

    Outdoor Stockyard

    Handles steel, timber, building products or long materials along a defined rail path. Wind, rain, drainage, corrosion and storm anchoring become part of the crane specification.

    Environmental boundary: standard weather protection does not establish explosion protection, marine corrosion resistance or high-temperature suitability.

    Project Configuration and Gantry Engineering Experience

    Representative 5 Ton Fabrication-Yard Basis

    Final dimensions and duty remain subject to the actual load cycle, site survey and runway design.

    Delivered Infrastructure Project Evidence

    It demonstrates the engineering process used for load definition, structural optimization, long-lift mechanisms, site constraints, electrical integration, inspection and project documentation.

    Engineering, Manufacturing and Quality Documentation

    Required records should be agreed before manufacturing release.

    Design Package

    General arrangement, wheel reactions, hook approaches, mechanism duty, electrical demand, control narrative and runway interface.

    Structural Records

    Material identification, welding procedures, welder qualifications, dimensions, connections and specified examination records.

    Mechanism Data

    Hoist, motor, gearbox, brake, rope, wheel, bearing, buffer and lubrication information matched to declared service.

    Electrical Documents

    Single-line diagram, schematics, drive data, protection settings, conductor details, control voltage and configured parameters.

    Inspection and Tests

    Inspection plan, dimensions, drives, brakes, limits, alarms, interlocks and contracted load-test records.

    Handover Package

    Final drawings, manuals, test records, spare-parts list, maintenance schedule and commissioning settings.

    Delivery, Installation and Commissioning

    Site Survey and Readiness

    Verify travel length, rail centers, clearance, foundations, embedded items, access route, assembly area, power supply and installation equipment.

    Packing and Delivery

    Separate bridge, legs, lower beams, hoist, electrical equipment and accessories into identified packages compatible with transport and site lifting limits.

    Gantry Assembly

    Assemble the structure in the approved sequence, control temporary stability and verify fasteners, joints, diagonals, platforms and access components.

    Rail and Alignment

    Check rail gauge, straightness, elevation, joints, stops, clips and foundation condition before powered crane travel and final wheel alignment.

    Electrical Installation

    Install crane power supply, festoon or conductor, panels, pendant or radio, grounding, limits, alarms and site isolation equipment.

    Functional Commissioning

    Verify travel directions, speeds, brakes, limits, emergency stop, warning devices, rail clamps, wind functions and control interlocks without load.

    Load and Acceptance Tests

    Complete proof, rated-load and operational checks under the approved procedure with assigned responsibility for test weights and witness points.

    Maintenance Handover

    Establish inspection intervals for structure, rails, wheels, brakes, rope, hook, electrification, weather protection and storm-security equipment.

    5 Ton Gantry Crane Price and Total Project Cost

    Market pricing varies sharply because a portable frame, an electric-hoist gantry and a complete installed rail system are different commercial packages. The following positions support preliminary budgeting only; a binding price requires approved dimensions, duty, environment and supply scope.

    Price control: compare capacity, span, lifting height, working class, hoist duty, travel drives, rail scope, outdoor equipment, electrical supply, documentation, freight and installation on the same basis. Tonnage alone cannot produce a dependable project price.

    Information Required for a 5 Ton Gantry Crane Quote

    A complete inquiry permits faster structural selection, more accurate wheel reactions and a commercially comparable scope. The following information should accompany the request.

    Load Data

    Maximum and normal load, dimensions, center of gravity, lifting points, attachment, sling and any fragile or hazardous characteristic.

    Capacity Basis

    Confirm 5 metric tons at the hook and identify every below-hook component included in the gross suspended load.

    Required Coverage

    Rail-center span, crane travel length, cantilever reach, pickup zones, placement zones and truck or machine access.

    Vertical Dimensions

    Rail elevation, required lifting height, lowest pickup, highest placement, bridge clearance and available installation headroom.

    Operating Cycle

    Lifts per hour, shifts, annual hours, average load, full-load frequency, travel distance and required operating speeds.

    Site and Foundation

    Indoor or outdoor location, slab or foundation information, proposed rail support, drainage, settlement and available drawings.

    Environment

    Temperature, wind, rain, snow, dust, humidity, corrosion, hazardous classification and coating requirement.

    Power and Control

    Voltage, frequency, phase, pendant or radio control, speed requirements, automation interface and preferred power-feed system.

    Commercial Scope

    Destination, Incoterm, packing, freight, rails, installation, commissioning, testing, training and spare-parts requirement.

    Is single girder or double girder better for a 5 ton gantry crane?

    Single girder is normally the economical baseline for general service. Double girder becomes appropriate when longer span, greater stiffness, higher duty, improved hook height, trolley access or process equipment creates a clear engineering advantage.

    Does a 5 ton rating equal 10,000 lb?

    Five metric tons equal approximately 11,023 lb. A 10,000 lb rated crane is approximately 4.54 metric tons and should not be represented as a 5 metric ton crane.

    Can a 5 ton gantry crane operate outdoors?

    Yes, when structure, coating, enclosures, electrification, drainage and wind-security equipment are designed for the declared site. Operating-wind and parked-crane requirements must be established for the project.

    Can the crane be moved while carrying 5 tons?

    A motorized rail-mounted industrial gantry is designed for controlled travel with the rated load under approved operating conditions. Portable caster-mounted frames follow model-specific movement restrictions and should never be assumed suitable for loaded travel.

    Are rails and foundations included?

    They are included only when identified in the commercial scope. Many equipment quotations provide crane wheel reactions and rail requirements while civil foundations, embedded steel, drainage and local installation remain site responsibility.

    What working class is suitable?

    A3–A5 is a common range for general electric-hoist gantries, but final classification follows load spectrum, lift frequency, shifts, annual hours and travel distances. Production service should not be specified from capacity alone.

    How is an accurate quotation prepared?

    Provide the load, span, lifting height, travel length, duty, environment, power supply, site drawings, destination and required delivery scope. The resulting proposal should state inclusions, exclusions, technical assumptions and approval documents.

    Related Gantry Crane Products

    European Single-Girder Gantry Crane

    Compact electric-hoist gantry configuration for workshops, yards and general industrial material transfer.

    Double-Girder Gantry Crane

    Two-girder platform for longer spans, higher duty, improved hook height and process-specific trolley systems.

    L-Type Offset Gantry Crane

    Offset-leg arrangement supporting truck access, side loading and cantilever coverage beyond the runway.

    Truss Gantry Crane

    Lattice bridge option for selected outdoor, large-span and transport-sensitive handling projects.

    Single-Girder Semi-Gantry Crane

    One elevated runway and one floor-running leg for defined production areas beside a building support.

    Compact Electric Hoist

    Space-efficient wire-rope hoist for compatible single-girder and selected double-girder gantry configurations.

    Submit load data, span, lifting height, travel length, duty, environment, power supply, destination and required delivery scope for a project-specific gantry crane proposal.

    Discuss the crane arrangement for your project.

    An equipment offer should identify the gantry arrangement and the work required at the destination. Provide the load and site brief, then clarify support, power, installation and handover responsibilities before ordering. Share the load, available drawings, working cycle and site conditions with Henan Mine Crane so the required configuration and supply boundary can be discussed.

    Related crane configurations

    5 Ton Overhead Crane

    View product parameters
    Lifting capacity: 5 tSpan: Project-specificLifting height: Project-specific; confirm the required vertical hook travel and available headroom

    Specify a 5 t overhead crane around the load, building and operating cycle. Compare single-girder, double-girder and underhung arrangements for your workshop.

    Updated 2026 · Henan Mine Crane

  • Grab Hook Gantry Crane

    Grab Hook Gantry Crane

    Gantry Cranes / Henan Mine Crane

    Grab Hook Gantry Crane

    Combine grab and hook handling on an electric-hoist gantry arrangement. Match the lifting appliance, load cases and changeover method to the outdoor handling layout.

    Lifting capacity1t – 20t
    Span6m – 30m
    Working classA5
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    TypeMHZE
    Product NameElectric Hoist Gantry Crane
    Rated Lifting Capacity1t – 20t
    Span6m – 30m
    Lifting Height4m – 18m
    Working ClassA5
    Grab Opening & Closing Time3-5s
    Switch ModeQuick change connecting device
    Wheel ProcessForging and rolling composite
    CouplingDrum tooth coupling
    Design FeatureModular design
    Operation ModePendant control / remote control
    Power Supply380V/50Hz; 220-660V/50-60Hz
    Protection LevelIP54
    ApplicationBulk cargo & piece goods mixed handling

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Mixed-material yards

    Transfer bulk materials and separately rigged unit loads within the specified area.

    Loading operations

    Coordinate pickup, discharge and vehicle positions with gantry coverage.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting arrangement

    Specify bulk density, grab weight and maximum hook load. Include lifting-appliance weight and the required lifting positions.

    02

    Site & available space

    Provide rail span, pickup or discharge points and vehicle clearances. Coordinate the installation interfaces with the available site drawings.

    03

    Duty & control sequence

    Define changeover procedure, lifting duty and outdoor operating conditions. Identify the required movements and control interfaces in the enquiry.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Grab Hook Gantry CraneCombine grab and hook handling on an electric-hoist gantry arrangement. Match the lifting appliance, load cases and changeover method to the outdoor handling layout.
    Grab And Hook Dual Purpose CraneSwitch between bulk-material pickup and hook lifting with a grab-and-hook overhead arrangement. Define each load case, the grab type and the changeover procedure for the working area.
    Single-Girder Gantry CraneCover an outdoor working area with a single-girder electric-hoist gantry crane. Coordinate span, lifting height, leg geometry and any cantilever coverage with the yard and loading route.
    Electromagnetic Hook Double Gantry CraneHandle steel products with a gantry arrangement combining hook and electromagnetic lifting functions. Define the trolley arrangement, load cases and changeover sequence for the yard.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Define travel limits, overload protection, traffic clearances and the outdoor operating limits for the proposed arrangement.

    02

    Installation & commissioning

    Agree rail foundations, runway alignment, wheel-load interfaces, erection access, electrical connections and commissioning responsibilities.

    03

    Inspection & spares

    Plan inspection and maintenance of grab connections, hoist equipment and travel mechanisms. Agree service access, documentation and the required spare-parts scope.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a grab hook gantry crane quotation?+

    Provide bulk density, grab weight and maximum hook load; rail span, pickup or discharge points and vehicle clearances; and changeover procedure, lifting duty and outdoor operating conditions. Include drawings and the project destination when available.

    Can the same rated capacity be assumed for every operating mode?+

    Provide the appliance dead weight and the material or unit-load weight for each mode. The proposal defines the permissible suspended loads and changeover arrangement.

    What installation and support scope should be agreed?+

    Agree rail foundations, runway alignment, wheel-load interfaces, erection access, electrical connections and commissioning responsibilities. Specify the documentation, training and spare-parts support needed for the project.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share bulk density, grab weight and maximum hook load, together with your site layout and operating cycle.

    info@hnksglobal.com
  • 5-Ton Bridge Crane Projects: Hook Coverage and Runway Interfaces

    5-Ton Bridge Crane Projects: Hook Coverage and Runway Interfaces

    Selection guide

    5-Ton Bridge Crane Projects: Hook Coverage and Runway Interfaces

    A five-ton bridge crane must reach the specified positions within the building. Show the runway geometry, obstructions and load transfer points so the supplier can check the proposed hoist and structural arrangement.

    Henan Mine CraneSelection guide · Updated 2026Crane selection, project scope and operating requirements
    Henan Mine Crane 5 Ton Overhead Crane
    Henan Mine Crane 5 Ton Overhead Crane
    Project planning notes

    Key points for this crane project.

    1. Plot the five-ton handling stations
    2. Review side and end approaches
    3. Coordinate the runway interface
    Read the technical guide

    Plot the five-ton handling stations

    On the workshop plan, mark every pickup and placement station. Show the load position at machines, storage areas and transport vehicles rather than mark only a general rectangle of coverage.

    Add the attachment dimensions and load orientation where they influence access. Check whether the component must rotate or pass through a restricted route between stations.

    Review side and end approaches

    The hook cannot normally reach every point inside the outside dimensions of the crane bay. Ask the supplier to show the closest permitted hook positions at both sides and both ends of travel.

    Overlay those positions on the handling plan. Where a station falls outside the proposed envelope, discuss a layout change or a different arrangement before assuming an extension of travel will solve the problem.

    Coordinate the runway interface

    Provide rail or beam details, support positions and relevant survey information. Request the proposed crane weight, wheel arrangement and reactions for review by the party responsible for the runway structure.

    When replacing an existing crane, compare the actual new interface with the available runway. An unchanged five-ton capacity does not establish identical wheel loads, spacing or clearance.

    Check vertical access and obstructions

    Show the required highest and lowest hook positions on a cross-section. Include roof steelwork, services and the height of the load and attachment above the pickup surface.

    Review maintenance access around the hoist and bridge as well as operating clearance. Identify how components can be inspected or removed without relying on a space that is occupied by the building or production equipment.

    Approve coverage with the interface drawing

    Keep the agreed hook envelope and runway interface on controlled drawings. Record any operating restrictions alongside them so production and installation teams use the same assumptions.

    For a proposal from Henan Mine Crane, send the station plan and runway information together. The selection discussion can then focus on the five-ton crane’s practical reach and structural interfaces.

    Discuss the crane arrangement for your project.

    A five-ton bridge crane must reach the specified positions within the building. Show the runway geometry, obstructions and load transfer points so the supplier can check the proposed hoist and structural arrangement. Share the load, available drawings, working cycle and site conditions with Henan Mine Crane so the required configuration and supply boundary can be discussed.

    Related crane configurations

    5 Ton Overhead Crane

    View product parameters
    Lifting capacity: 5 tSpan: Project-specificLifting height: Project-specific; confirm the required vertical hook travel and available headroom

    Specify a 5 t overhead crane around the load, building and operating cycle. Compare single-girder, double-girder and underhung arrangements for your workshop.

    Grab And Hook Dual Purpose Crane

    View product parameters
    Lifting capacity: 5 – 16 tSpan: 10.5 – 31.5 mLifting height: 6 – 20 m

    Switch between bulk-material pickup and hook lifting with a grab-and-hook overhead arrangement. Define each load case, the grab type and the changeover procedure for the working area.

    Updated 2026 · Henan Mine Crane

  • Grab And Hook Dual Purpose Crane

    Grab And Hook Dual Purpose Crane

    Overhead Cranes / Henan Mine Crane

    Grab And Hook Dual Purpose Crane

    Switch between bulk-material pickup and hook lifting with a grab-and-hook overhead arrangement. Define each load case, the grab type and the changeover procedure for the working area.

    Lifting capacity5 – 16 t
    Span10.5 – 31.5 m
    Working classA5 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5 – 16 t
    Span10.5 – 31.5 m
    Lifting height6 – 20 m
    Working classA5 – A6
    Hoisting speed15 – 40 m/min
    Trolley travel5 – 20 m/min
    Crane travel10 – 40 m/min
    Power supply220-690V, 50/60Hz
    ControlsWireless Remote / Cabin Control
    Lifting arrangementDetachable Hydraulic Grab

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Bulk materials

    Transfer declared loose materials between receiving and discharge positions.

    Unit loads

    Handle separately rigged components using the specified hook arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting arrangement

    Specify bulk density, material size and separately rigged load cases. Include lifting-appliance weight and the required lifting positions.

    02

    Site & available space

    Provide pickup points, discharge height and hook coverage. Coordinate the installation interfaces with the available site drawings.

    03

    Duty & control sequence

    Define grab type, appliance weight and mode-change requirements. Identify the required movements and control interfaces in the enquiry.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Grab And Hook Dual Purpose CraneSwitch between bulk-material pickup and hook lifting with a grab-and-hook overhead arrangement. Define each load case, the grab type and the changeover procedure for the working area.
    Intelligent Grab Overhead CraneHandle bulk materials with a grab overhead crane configured for the material and working cycle. Select the grab volume, lifting arrangement and operating sequence from pickup and discharge conditions.
    Single Girder Grab CraneLift loose bulk material with an LDZ single-girder grab crane. Select the grab, complete suspended load and pickup or discharge geometry around the material and working cycle.
    Grab Hook Gantry CraneCombine grab and hook handling on an electric-hoist gantry arrangement. Match the lifting appliance, load cases and changeover method to the outdoor handling layout.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

    02

    Installation & commissioning

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

    03

    Inspection & spares

    Plan inspection and maintenance of grab mechanisms, hook connections and hoist rope systems. Agree service access, documentation and the required spare-parts scope.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a grab and hook dual purpose crane quotation?+

    Provide bulk density, material size and separately rigged load cases; pickup points, discharge height and hook coverage; and grab type, appliance weight and mode-change requirements. Include drawings and the project destination when available.

    How is the grab capacity selected?+

    Grab volume and dead weight must be checked against material bulk density, pickup conditions and the permissible suspended load. Define the hook load separately for the alternate operating mode.

    What installation and support scope should be agreed?+

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share bulk density, material size and separately rigged load cases, together with your site layout and operating cycle.

    info@hnksglobal.com
  • Galvanizing Process Overhead Crane

    Galvanizing Process Overhead Crane

    Overhead Cranes / Henan Mine Crane

    Galvanizing Process Overhead Crane

    Transfer suspended workpieces through a galvanizing process with a crane matched to the line. Coordinate lifting points, corrosive exposure, tank geometry and the required handling sequence.

    Lifting capacity5 – 32 t
    Span10.5 – 31.5 m
    Working classA5 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5 – 32 t
    Span10.5 – 31.5 m
    Lifting height6 – 24 m
    Working classA5 – A6
    Hoisting speed5 – 25 m/min
    Crane travel8 – 40 m/min
    Power supply220-690V, 50/60Hz
    ControlsWireless Remote / Cabin Control

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Galvanizing lines

    Move suspended workpieces between treatment and handling positions.

    Long fabricated products

    Coordinate lifting points, orientation and clearances around process tanks.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting arrangement

    Specify workpiece dimensions, lifting points and suspended fixture weight. Include lifting-appliance weight and the required lifting positions.

    02

    Site & available space

    Provide tank positions, clearances and the complete process travel path. Coordinate the installation interfaces with the available site drawings.

    03

    Duty & control sequence

    Define corrosive exposure, heat, transfer timing and control interfaces. Identify the required movements and control interfaces in the enquiry.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Galvanizing Process Overhead CraneTransfer suspended workpieces through a galvanizing process with a crane matched to the line. Coordinate lifting points, corrosive exposure, tank geometry and the required handling sequence.
    Double Trolley Electric Hoist CraneLift long components or serve separate working positions with two electric-hoist trolleys on one bridge. Trolley spacing, load sharing and independent or coordinated operation are specified for the task.
    Three Trolley Electric Hoist CraneCoordinate three electric-hoist trolleys for long components or several workshop lifting positions. Define hook loads, trolley spacing and permitted individual or combined movements.
    Modular Electric Hoist Overhead CraneUse a modular electric-hoist overhead crane for production, assembly and maintenance lifting. Select the hoist arrangement, hook coverage and movement control for the workshop and operating cycle.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

    02

    Installation & commissioning

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

    03

    Inspection & spares

    Plan inspection and maintenance of lifting fixtures, exposed electrical equipment and corrosion protection. Agree service access, documentation and the required spare-parts scope.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a galvanizing process overhead crane quotation?+

    Provide workpiece dimensions, lifting points and suspended fixture weight; tank positions, clearances and the complete process travel path; and corrosive exposure, heat, transfer timing and control interfaces. Include drawings and the project destination when available.

    Why is the process sequence needed?+

    Tank entry, withdrawal, transfer and holding positions determine the movement and control requirements. Include fixture details and any synchronised lifting or line interlocks.

    What installation and support scope should be agreed?+

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share workpiece dimensions, lifting points and suspended fixture weight, together with your site layout and operating cycle.

    info@hnksglobal.com
  • 4-Ton Gantry Crane Enquiries: Confirm the Load and Site Arrangement

    4-Ton Gantry Crane Enquiries: Confirm the Load and Site Arrangement

    Selection guide

    4-Ton Gantry Crane Enquiries: Confirm the Load and Site Arrangement

    A four-ton handling requirement should be developed into a complete operating brief. Describe the attachments, working envelope, supporting surface and required movements so a suitable configuration can be proposed.

    Henan Mine CraneSelection guide · Updated 2026Crane selection, project scope and operating requirements
    Henan Mine Crane overhead crane inside a workshop bay
    Henan Mine Crane overhead crane inside a workshop bay
    Project planning notes

    Key points for this crane project.

    1. Turn the four-ton task into a complete brief
    2. Decide what movement the site needs
    3. Describe the support surface
    Read the technical guide

    Turn the four-ton task into a complete brief

    Describe the heaviest item, its dimensions and the lifting attachment. Confirm the unit used for the load and identify the required maximum combined suspended load for engineering review.

    Explain whether the work is an occasional maintenance lift, repeated production transfer or movement between storage positions. These tasks can require different travel, control and service arrangements even when the load requirement is similar.

    Decide what movement the site needs

    Mark the pickup and destination points and explain whether the crane must travel while carrying a load. Identify any restricted routes, turns, doors or shared work areas.

    Discuss a stationary, rail-travelling or other engineered arrangement against the actual operating brief. Do not assume a portable-looking gantry is suitable for loaded travel or that an advertised capacity applies under every movement condition.

    Describe the support surface

    Provide information about the floor or ground, available foundations and route condition. Show joints, slopes, drains and other discontinuities where they affect the proposed travel path.

    Ask the supplier for the support and travel requirements of the selected arrangement. The site engineer should review the actual reactions and interface rather than infer suitability from the gantry’s rated load.

    Check the lifting envelope

    State the required clear span and hook levels. Include the height of the load, attachment and any equipment it must clear during transfer.

    Compare the crane’s legs and other structural parts with vehicle and pedestrian routes. Identify where the gantry will be parked and how routine inspection or component replacement will be performed.

    Send an enquiry that exposes assumptions

    Include a site sketch, photographs, load information and a short description of the intended movements. Identify any dimensions or floor data still awaiting confirmation.

    Ask Henan Mine Crane to identify the proposed arrangement, permitted operation, support requirements and supply scope. This is a stronger starting point than selecting a four-ton gantry by appearance alone.

    Discuss the crane arrangement for your project.

    A four-ton handling requirement should be developed into a complete operating brief. Describe the attachments, working envelope, supporting surface and required movements so a suitable configuration can be proposed. Share the load, available drawings, working cycle and site conditions with Henan Mine Crane so the required configuration and supply boundary can be discussed.

    Related crane configurations

    Explore crane product families and technical parameters ↗

    Updated 2026 · Henan Mine Crane

  • Four Beam Casting Crane

    Four Beam Casting Crane

    Overhead Cranes / Henan Mine Crane

    Four Beam Casting Crane

    Handle molten-metal ladles with a YZS four-beam casting crane. Main and auxiliary trolley functions, thermal exposure and the lifting sequence are selected for the casting process.

    Lifting capacity125/32–320/80 t
    Span10m~40m
    Working classA6~A8
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    ModelYZS
    Rated Lifting Capacity125/32–320/80 t
    Structural FormFour beam four/six rail, double trolley
    Working ClassA6~A8
    Span10m~40m
    Lifting Height6m~30m
    Lifting DeviceMain trolley: gantry type plate hook; Auxiliary trolley: forged hook
    Control SystemPLC module + HMI touch screen + WLK master controller
    Hoisting Anti-collision ProtectionRotary limit (two-level protection) + weight hammer limit
    Control ModePLC + frequency converter communication control
    Safety SystemFull vehicle safety monitoring system
    Heat Insulation ProtectionMulti-layer high-temperature heat insulation material for key parts
    Structural DesignFinite element analysis optimized stress distribution
    Power Supply380V/50Hz; 220V-660V/50Hz/60Hz
    Protection LevelIP60

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Steelmaking and casting

    Transfer ladles between furnace, receiving and casting positions.

    Ladle handling

    Coordinate the main lifting appliance and the required auxiliary movement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting arrangement

    Specify ladle gross load, trunnion geometry and auxiliary lifting task. Include lifting-appliance weight and the required lifting positions.

    02

    Site & available space

    Provide process layout, runway geometry and maintenance access. Coordinate the installation interfaces with the available site drawings.

    03

    Duty & control sequence

    Define heat exposure, operating cycle and required monitoring or interlocks. Identify the required movements and control interfaces in the enquiry.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Four Beam Casting CraneHandle molten-metal ladles with a YZS four-beam casting crane. Main and auxiliary trolley functions, thermal exposure and the lifting sequence are selected for the casting process.
    Double Girder Casting CraneLift and transfer molten-metal ladles with a YZ casting crane configured for the full suspended load and casting process. Review ladle interfaces, thermal exposure and the operating sequence together.
    Metallurgical Bridge CraneLift hot process loads with a YZD metallurgical bridge arrangement selected for the complete load and thermal conditions. Specify the lifting appliance, duty cycle and operating-protection requirements.
    YX Metallurgical Bridge CraneLift and turn material boxes with a YX metallurgical crane arrangement. The box interface, centre of gravity, turnover sequence and thermal conditions determine the lifting system.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

    02

    Installation & commissioning

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

    03

    Inspection & spares

    Plan inspection and maintenance of ladle lifting connections, hoisting brakes and thermal protection. Agree service access, documentation and the required spare-parts scope.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a four beam casting crane quotation?+

    Provide ladle gross load, trunnion geometry and auxiliary lifting task; process layout, runway geometry and maintenance access; and heat exposure, operating cycle and required monitoring or interlocks. Include drawings and the project destination when available.

    What information defines the main and auxiliary arrangements?+

    Provide the ladle drawing, complete suspended load and the auxiliary handling sequence. Trolley functions, hook ratings and permitted operating combinations are defined in the approved specification.

    What installation and support scope should be agreed?+

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share ladle gross load, trunnion geometry and auxiliary lifting task, together with your site layout and operating cycle.

    info@hnksglobal.com
  • Explosion-Proof Suspended Overhead Crane

    Explosion-Proof Suspended Overhead Crane

    Overhead Cranes / Henan Mine Crane

    Explosion-Proof Suspended Overhead Crane

    Provide suspended electric-hoist lifting within a declared hazardous area. Review the overhead support, lifting duty and protection of the hoist, travel drives and controls as one system.

    Lifting capacity1t – 10t
    Span7.5m – 28.5m
    Working classA3 – A5
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Rated Lifting Capacity1t – 10t
    Basic Span7.5m – 28.5m
    Lifting Height6m – 20m
    Hazardous-area configurationMatched to the declared area classification, material group and temperature requirements
    Hoist TypeSpecial explosion-proof electric hoist
    Drive MotorExplosion-proof type motor
    Working ClassA3 – A5
    Lifting Speed2m/min – 10m/min
    Crane Travel Speed15m/min – 25m/min
    Control ModeExplosion-proof ground handle / wireless remote
    Power Supply380V/50Hz; 220V-660V/60Hz
    Protection LevelIP55 (IP65 optional)
    Working Temperature-20℃ ~ 45℃
    Structural FeatureModular assembly

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Classified workshops

    Provide overhead lifting coverage beneath a suspended runway.

    Process access

    Coordinate the hook positions with maintenance and production equipment.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting arrangement

    Specify suspended load, lifting height and lifting attachment. Include lifting-appliance weight and the required lifting positions.

    02

    Site & available space

    Provide runway supports, building reactions and available clearances. Coordinate the installation interfaces with the available site drawings.

    03

    Duty & control sequence

    Define gas or dust classification, temperature limits and operating duty. Identify the required movements and control interfaces in the enquiry.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Explosion-Proof Suspended Overhead CraneProvide suspended electric-hoist lifting within a declared hazardous area. Review the overhead support, lifting duty and protection of the hoist, travel drives and controls as one system.
    Explosion Proof Electric Hoist Bridge CraneUse an electric-hoist bridge arrangement for a declared hazardous area. The hoist, drives, controls and electrical installation are specified for the area classification and lifting duty.
    Explosion-Proof Bridge CraneUse a QB bridge crane for lifting in a declared explosive-gas environment. Select the load rating, main and auxiliary arrangement, electrical protection and control mode for the project.
    Dust-Proof Explosion-Proof Overhead CraneConfigure suspended lifting for a declared combustible-dust environment. Dust classification, surface-temperature limits and enclosure requirements form part of the crane and hoist specification.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

    02

    Installation & commissioning

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

    03

    Inspection & spares

    Plan inspection and maintenance of suspension hardware, protected drives and cable systems. Agree service access, documentation and the required spare-parts scope.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a explosion-proof suspended overhead crane quotation?+

    Provide suspended load, lifting height and lifting attachment; runway supports, building reactions and available clearances; and gas or dust classification, temperature limits and operating duty. Include drawings and the project destination when available.

    What is required from the building designer?+

    Provide runway and supporting-structure information for review against the proposed crane reactions and clearances. The support arrangement and hazardous-area installation must be coordinated.

    What installation and support scope should be agreed?+

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share suspended load, lifting height and lifting attachment, together with your site layout and operating cycle.

    info@hnksglobal.com
  • 3-Ton Overhead Crane Purchasing: Capacity, Hoist and Bay Fit

    3-Ton Overhead Crane Purchasing: Capacity, Hoist and Bay Fit

    Selection guide

    3-Ton Overhead Crane Purchasing: Capacity, Hoist and Bay Fit

    A three-ton enquiry needs the same attention to geometry and working duty as a larger crane project. Define the load, lifting range and building interfaces before comparing equipment arrangements and supplier scope.

    Henan Mine CraneSelection guide · Updated 2026Crane selection, project scope and operating requirements
    double-girder electric hoist crane by Henan Mine Crane
    double-girder electric hoist crane by Henan Mine Crane
    Project planning notes

    Key points for this crane project.

    1. Is a 3 Ton Overhead Crane the Correct Capacity?
    2. 3 Ton Overhead Crane Configurations
    3. Selection Considerations
    Read the technical guide

    Is a 3 Ton Overhead Crane the Correct Capacity?

    The limit must include the payload, hook-below attachments, lifting beam, magnet, clamps, slings and every other component suspended from the crane.

    A higher-capacity crane, lighter lifting attachment or revised handling method is required. Normal operating load, maximum occasional load and future production changes should be stated separately.

    Capacity units must also be explicit. Drawings, load plates, quotations and acceptance documents should use one declared unit basis to prevent a material capacity mismatch.

    Machining and Tooling

    Move fixtures, molds, dies, machine components and finished parts between workstations. Define the center of gravity, attachment method and required placement accuracy.

    Fabrication and Assembly

    Transfer frames, weldments and subassemblies through a production bay. Verify load dimensions, turning space, side approach and obstructions along the route.

    Warehouse and Maintenance

    Handle unit loads or remove service components above machinery. Confirm access over racks, maintenance platforms, ducts, doors and existing equipment.

    Production Cells

    Support repeated loading, positioning and unloading around machines or assembly stations. The load spectrum and cycles per hour determine the required mechanism duty.

    3 Ton Overhead Crane Configurations

    Selection should begin with the building section, highest hook position, runway concept, operating frequency and handling route rather than girder count alone.

    01 · Top-Running Single Girder

    One bridge girder travels on top of the runway rails and carries an electric wire-rope or chain hoist.

    02 · Underhung Single Girder

    The bridge travels below suitable runway beams. It can serve buildings where a suspended runway arrangement is practical, but the supporting beams, connections, roof loads and end clearances require structural verification.

    03 · Double Girder with Electric Hoist

    Two bridge girders support a trolley-mounted electric hoist.

    04 · Compact Variable-Frequency Crane

    A compact hoist, optimized bridge and variable-frequency motions can improve hook approach, positioning and operating smoothness. Component package, headroom target, controls and working class place it above a basic standard configuration in price.

    05 · Freestanding Runway System

    Independent columns and runway beams support the crane when the existing building cannot carry crane loads. The complete project includes column layout, bracing, foundations, rail alignment and coordination with production routes.

    06 · Application-Specific 3 Ton System

    Cleanroom, corrosion-resistant, high-temperature or other special environments require a dedicated technical agreement. Hazardous-area equipment must match the formal area classification; a general workshop crane cannot be relabeled for that service.

    Selection Considerations

    The following project data determine whether the crane will reach the load, fit the building, operate at the required pace and transfer acceptable reactions to the supporting structure.

    List the heaviest and typical payloads, attachment weights, load dimensions, lifting points and center-of-gravity positions. Identify future products that may change the load spectrum.

    Provide runway centerline spacing, total travel distance, pickup and placement locations and any required side or end approaches. Nominal building width is not the crane span.

    State the highest required hook position and lowest pickup level. Include load height, slings, lifting beam and any extraction distance needed above machinery.

    Define lifts per hour, load distribution, travel distances, shifts and annual operating hours. Repeated positioning moves and near-capacity lifts influence mechanism and crane duty.

    Provide column spacing, runway elevation, rail or beam details, roof members and available support information. New crane wheel loads must be checked against the actual structure.

    Specify pendant, radio or cabin control, required speeds, dual-speed or variable-frequency motion, positioning tolerance and any process interlock or anti-sway requirement.

    Confirm indoor or outdoor use, temperature, humidity, dust, corrosion, washdown, cleanroom and hazardous-area conditions. Environmental requirements affect materials, enclosures and coatings.

    Identify the installation country, power supply, applicable requirements, inspection body, documentation language, factory tests, site tests and commissioning responsibility.

    Configuration rule: single and double girder describe the bridge structure; top running and underhung describe how the bridge travels on its runways. A hoist travelling below a girder does not automatically make the whole crane an underhung system.

    3 Ton Overhead Crane Compared with Other Configurations

    Compare arrangements at the same capacity, hook position and duty.

    ConfigurationRunway ArrangementTypical UseCommercial Position
    Top-Running Single GirderBridge wheels run on rails above the runway beams.General workshop, assembly, maintenance and warehouse hook handling.Primary cost-controlled powered configuration.
    LX Underhung CraneBridge end carriages run on the lower flanges of suspended runway beams.Buildings suited to an underhung support concept and lighter industrial handling.Can reduce the need for floor columns, subject to building suitability.
    Double Girder with Electric HoistTwo girders travel on top-running end carriages.Projects requiring a different trolley layout, access or lifting envelope.Higher structural and shipping cost than a routine single-girder crane.
    Compact VFD Overhead CraneOptimized top-running bridge with compact hoist and controlled motions.Production lines needing smooth acceleration, positioning and efficient hook approach.Higher component and control package than a basic standard crane.
    Freestanding Bridge Crane SystemCrane runs on independent steel columns and runway beams.Existing buildings without verified crane-supporting structure.Adds runway steel, bracing, foundations and site erection.

    3 Ton Overhead Crane Technical Framework

    The ranges below describe the broader product families and do not mean that every span, lifting height, speed and working-class combination is available without engineering review. The approved data sheet controls the supplied crane.

    Request the selected crane weight, maximum wheel loads, wheel spacing, rail or beam interface, hook approaches, crane envelope, power demand and mechanism data with the quotation. Lifting height means vertical hook travel; it does not by itself establish the minimum required building height.

    Headroom, Hook Coverage and Runway Compatibility

    Highest hook position: show the highest required load position, load height, slings, lifting beam and clearance above the load. A machine-maintenance lift may require vertical extraction before the load can travel horizontally.

    Side and end approaches: the nominal span does not show where the hook can reach. Compare the hook centerline to walls, columns and runway ends, including the trolley and bridge buffers.

    Crane self-weight, wheel spacing, maximum wheel loads, horizontal forces, rail details and operating duty may differ.

    Low-headroom selection: a compact hoist can improve the hook position, while an underhung bridge changes the runway arrangement. These are separate design decisions and should be compared using dimensioned drawings.

    Hoisting, Travel and Control Options

    The selected motion package should match both throughput and placement requirements. Higher speed is not automatically more productive when operators must repeatedly align the load, and a low-speed function does not replace an appropriate duty rating or braking system.

    Hoisting Motion

    Define normal and precision lifting needs, hook travel, lifting frequency, braking and the percentage of lifts near rated capacity. Two-speed or variable-frequency control can support controlled placement where the process requires it.

    Trolley Motion

    The hoist or trolley moves across the bridge. Its dimensions, wheel arrangement, speed and stopping position determine usable side approach and influence the crane envelope.

    Bridge Motion

    End carriages move along the runways. Drive selection, wheel alignment, runway geometry, acceleration and braking should produce stable travel over the full bay length.

    Operator Control

    Pendant control supports local operation; radio control can improve visibility and operator position. Control selection must account for access, shared work areas, emergency functions and local operating procedures.

    Variable-Frequency Control

    Controlled acceleration and deceleration can reduce abrupt motion and improve positioning. Specify required speed range, response, braking behavior and process interfaces rather than requesting VFDs without a performance basis.

    Power Supply

    Confirm voltage, frequency and phases, together with the runway conductor or festoon scope, isolation point, grounding and any voltage-drop limitation. Destination power data must be agreed before manufacture.

    Safety and Application Requirements

    Safety functions, inspections and acceptance methods should be listed in the technical agreement for the selected configuration and destination. The final design must follow the governing project requirements rather than a generic feature list.

    Load and Hoisting Protection

    Specify overload protection, upper and lower lifting limits, brakes, hook requirements and the verification method used during factory and site acceptance.

    Travel Protection

    Define bridge and trolley limits, buffers, end stops and relevant wheel protection. Shared runways require an agreed separation or anti-collision strategy.

    Electrical Safety

    Establish main isolation, emergency stops, phase and motor protection, enclosure ratings, grounding and identification. Site incoming power and crane-mounted distribution should have a clear interface.

    Operator and Maintenance Access

    Assess visibility, operating position, lockout points and safe access to the hoist, brakes, wheels, limits and electrical equipment. Maintenance clearances belong in the layout review.

    Special Environments

    Heat, corrosive atmosphere, dust, clean areas and outdoor exposure require application-specific materials and protection. A formally classified hazardous area requires verified explosion-protection design and documentation.

    Load Testing and Handover

    Agree factory functional tests, site inspection, applicable proof or load tests, responsibility for test weights, commissioning records, manuals and operator familiarisation before shipment.

    Project Application Case: Intelligent Steel-Plate Warehouse Handling

    Henan Mine Crane developed an intelligent warehouse-management crane for a steel-structure operation that required coordinated inbound handling, storage, sorting and outbound movement of steel plate. The project addressed manual dependence, material identification, inventory coordination and handling consistency.

    The crane solution integrated vehicle recognition, steel-plate identification, automatic marking, stacking and de-stacking functions with warehouse and enterprise information systems.

    The required capacity and duty for every new system are calculated independently from its load data and operating cycle.

    Engineering Deliverables and Manufacturing Records

    A purchase order should define the drawings, component data and quality records required for approval and handover. Documentation needs vary by destination and project, so the final document register should be agreed before production.

    General Arrangement

    Crane envelope, span, lift, hook approaches, rail or beam interface, wheel spacing, wheel loads, support reactions and maintenance clearances.

    Component and Electrical Data

    Hoist, motors, brakes, gearboxes, wheels, controls, conductor interface, electrical drawings, power demand and selected protective functions.

    Manufacturing Records

    Material identification, welding procedures, welder qualifications, dimensional inspection, specified NDT, machining, assembly and coating records.

    Testing and Handover

    Factory functional checks, limits and brake tests, overload-device settings, site test plan, commissioning reports, manuals, spare-parts list and training records.

    Installation, Commissioning and Lifecycle Planning

    Site Survey and Readiness

    Confirm runway geometry, structural capacity, clearances, access, floor loading, incoming power and assembly space. Existing rails or beams should be measured rather than assumed from old drawings.

    Packing and Delivery

    Agree export packing, bridge shipping sections, package list, inland and ocean transport, insurance, destination unloading and storage protection. Long girders may require a different freight method.

    Erection and Alignment

    Define who installs runway components, crane bridge, hoist, conductors and controls. Plan lifting equipment, work permits, production shutdowns, rail alignment and temporary access.

    Commissioning and Acceptance

    Agree no-load checks, rated functions, limits, brakes, controls, applicable load tests, third-party inspection, document handover and operator training.

    Maintenance Access

    Provide safe access for ropes or chains, hooks, brakes, wheels, travel drives, limits and electrical panels. Verify that components can be removed without interference from the roof or services.

    Spare Parts and Service

    Identify commissioning spares, wear parts and long-lead components. Maintenance intervals should follow the supplied manuals, actual operating duty and applicable inspection requirements.

    3 Ton Overhead Crane Price and Supply Scope

    Current market listings range from basic international factory packages to branded modular kits and complete freestanding systems, so price must always be read together with span, lift, duty and included scope.

    The September 2026 bands below support preliminary budgeting and are not fixed Henan Mine Crane selling prices. A formal quotation requires approved project data and a defined commercial boundary.

    Low advertised prices may describe a hoist, component kit or restricted factory package rather than an operating crane system. Compare every proposal using the same load, span, lift, duty, control method, environmental protection, documentation and delivery term.

    Cost GroupTypical Included ItemsItems Requiring Explicit ConfirmationProcurement Check
    Crane equipmentBridge, end carriages, hoist or trolley, drives, control panel and crane-mounted wiringControl station, VFDs, special protections, conductor interface and spare partsConfirm the complete component schedule and selected brands or technical requirements.
    Runway and supporting structureOnly the rails, beams, columns or brackets expressly listed in the offerStructural assessment, foundation design, concrete, bracing, rail clips and alignmentObtain maximum wheel loads and reactions before site steel or civil work begins.
    LogisticsContracted export packing and freight under the stated trade termInsurance, import charges, destination handling, unloading and inland transportCompare shipment dimensions, package count, trade term and destination responsibilities.
    Installation and acceptanceOnly erection supervision, installation, testing or training expressly listedSite cranes, access equipment, labor, power connection, test weights and inspection feesUse a responsibility matrix that assigns every activity and acceptance document.

    Equipment Price

    Crane structure, hoist or trolley, travel machinery, controls and the specified crane-mounted safety package.

    Site Infrastructure

    Runway beams or rails, columns, bracing, foundations, incoming power, conductor system and access provisions.

    Delivery Cost

    Export packing, shipping sections, freight, insurance, import handling, unloading and inland delivery.

    Installed Project Cost

    Erection, alignment, electrical connection, commissioning, applicable load testing, inspection and training.

    How much does a 3 ton overhead crane cost?

    Runways, freight and site work are additional unless expressly included.

    Is a 3 ton overhead crane the same as a bridge crane or EOT crane?

    The terms often describe the same moving-bridge lifting system. A valid specification should identify the bridge arrangement, top-running or underhung runway, hoist type, capacity unit, span, lift and operating duty.

    Can a 3 ton crane lift a 3,000 kg machine?

    Only when the complete suspended load remains within the approved capacity.

    Which configuration is normally selected for a 3 ton workshop crane?

    A top-running single-girder crane with an electric hoist is a common starting configuration. An underhung, double-girder, compact or freestanding system may be more suitable after the building structure, hook coverage, headroom, duty and site interfaces are evaluated.

    How much building height does a 3 ton crane require?

    There is no universal minimum. Provide the highest required hook position, load and rigging height, runway elevation, roof structure and overhead services. The dimensioned general arrangement establishes the required clearances.

    Can a 3 ton crane use an existing runway?

    The existing runway can be assessed using survey data, rail or beam details, support information and the proposed crane reactions. The former crane rating alone is insufficient because wheel loads, wheel spacing, geometry and duty may differ.

    Can a 3 ton crane repeatedly lift its full rated load?

    The selected crane and mechanism duty must match the operating cycle and load spectrum. State lifts per hour, travel distances, shifts and the frequency of near-capacity loads. Rated capacity alone does not define continuous production capability.

    When should a 5 ton crane be considered instead?

    Compare the resulting crane weight, wheel loads, dimensions, runway requirements and installed cost before increasing capacity.

    Does the quotation include runway beams and installation?

    Only when the commercial offer lists them. Request separate identification of crane equipment, runway and supports, electrification, freight, unloading, erection, testing, commissioning and third-party inspection.

    What information is required for a formal quotation?

    Provide maximum and typical loads, attachments, span, lift, runway length, building section, duty, speeds, controls, power, environment, project location, standards, delivery address and the required installation and acceptance scope.

    Related Overhead Crane Products

    Compare product families using the same capacity, hook position, duty, runway and commercial scope.

    Single-Girder Overhead Crane

    Cost-controlled top-running bridge and electric-hoist arrangement for general industrial lifting.

    Double-Girder Electric Hoist Crane

    Two-girder bridge with a trolley-mounted electric hoist for project-defined coverage and duty.

    LX Underhung Overhead Crane

    Suspended bridge arrangement for compatible runway beams and building structures.

    Compact VFD Overhead Crane

    Compact hoist and variable-frequency motions for controlled production-line handling.

    Double-Trolley Overhead Crane

    Two-trolley arrangement for loads requiring defined lifting-point spacing or coordinated movement.

    Explosion-Proof Overhead Crane

    Dedicated crane family for formally classified hazardous gas or dust environments; capacity requires confirmation.

    A project-specific proposal is prepared from the maximum gross load, lifting attachments, span, runway length, hook positions, building cross-section, operating cycle, controls, power supply, environment, destination and required supply boundary.

    Discuss the crane arrangement for your project.

    A three-ton enquiry needs the same attention to geometry and working duty as a larger crane project. Define the load, lifting range and building interfaces before comparing equipment arrangements and supplier scope. Share the load, available drawings, working cycle and site conditions with Henan Mine Crane so the required configuration and supply boundary can be discussed.

    Related crane configurations

    LH Electric Hoist Double Girder Crane

    View product parameters
    Lifting capacity: 3, 5, 10, 16, 20 tSpan: 10.5–31.5 mLifting height: 6, 9, 12 or 18 m

    Use an LH double-girder bridge with an electric-hoist trolley for workshop lifting, assembly and maintenance. Match the hoist arrangement to the suspended load, hook travel and available building space.

    Double Trolley Electric Hoist Crane

    View product parameters
    Lifting capacity: 1+1 – 32+32 tSpan: 7.5 – 31.5 mLifting height: 6 – 30 m

    Lift long components or serve separate working positions with two electric-hoist trolleys on one bridge. Trolley spacing, load sharing and independent or coordinated operation are specified for the task.

    Updated 2026 · Henan Mine Crane

  • Explosion-Proof Bridge Crane

    Explosion-Proof Bridge Crane

    Overhead Cranes / Henan Mine Crane

    Explosion-Proof Bridge Crane

    Use a QB bridge crane for lifting in a declared explosive-gas environment. Select the load rating, main and auxiliary arrangement, electrical protection and control mode for the project.

    Lifting capacity5–50/10 t
    Span10.5~31.5
    Working classA4 ~ A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    ModelQB
    Lifting weight(t)5–50/10 t
    Span (m)10.5~31.5
    Lifting height (m)1~16
    Working classA4 ~ A6
    Hazardous-area configurationMatched to the declared area classification, material group and temperature requirements
    Lifting speed (m/min)3.7
    Trolley speed (m/min)9.3
    Crane moving speed (m/min)12
    Recommended railsP43
    power380V 50Hz 3Ph

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Hazardous production bays

    Transfer loads within the declared classified working area.

    Equipment maintenance

    Coordinate hook coverage and operating access around process equipment.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting arrangement

    Specify main and auxiliary lifting tasks and complete suspended loads. Include lifting-appliance weight and the required lifting positions.

    02

    Site & available space

    Provide runway span, hook height and equipment clearances. Coordinate the installation interfaces with the available site drawings.

    03

    Duty & control sequence

    Define area classification, temperature requirements and operating duty. Identify the required movements and control interfaces in the enquiry.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Explosion-Proof Bridge CraneUse a QB bridge crane for lifting in a declared explosive-gas environment. Select the load rating, main and auxiliary arrangement, electrical protection and control mode for the project.
    Explosion Proof Electric Hoist Bridge CraneUse an electric-hoist bridge arrangement for a declared hazardous area. The hoist, drives, controls and electrical installation are specified for the area classification and lifting duty.
    Explosion-Proof Suspended Overhead CraneProvide suspended electric-hoist lifting within a declared hazardous area. Review the overhead support, lifting duty and protection of the hoist, travel drives and controls as one system.
    Dual Trolley Explosion Proof Bridge CraneCombine two-trolley handling with the declared hazardous-area specification. Coordinate hook loads, lifting sequence, electrical protection and operator controls for the complete installation.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

    02

    Installation & commissioning

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

    03

    Inspection & spares

    Plan inspection and maintenance of brakes, protected electrical devices and lifting mechanisms. Agree service access, documentation and the required spare-parts scope.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a explosion-proof bridge crane quotation?+

    Provide main and auxiliary lifting tasks and complete suspended loads; runway span, hook height and equipment clearances; and area classification, temperature requirements and operating duty. Include drawings and the project destination when available.

    Do main and auxiliary hooks have the same permitted operation?+

    Specify each lifting task and whether combined operation is required. The technical proposal defines the hook ratings, operating combinations and hazardous-area configuration.

    What installation and support scope should be agreed?+

    Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share main and auxiliary lifting tasks and complete suspended loads, together with your site layout and operating cycle.

    info@hnksglobal.com