Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

Blog

  • Overhead Crane RFQ Checklist: Load, Dimensions and Supply Scope

    Overhead Crane RFQ Checklist: Load, Dimensions and Supply Scope

    The crane buyer’s field guide

    Overhead Crane RFQ Checklist: Load, Dimensions and Supply Scope

    Prepare the load, workshop measurements and working cycle before comparing crane proposals. Use the checklist and brief builder to define the same scope for every supplier.

    Henan Mine CraneSelection guide · 2026For procurement teams & plant engineers
    Henan Mine Crane overhead crane operating above a workshop bay
    Start with the lifting task and the building it needs to work in.
    Before you ask for a price

    Give every supplier
    a clear project brief.

    1. Give suppliers the same project inputs.
    2. Check the fit before comparing models.
    3. Separate equipment from site work.
    Build your quotation brief

    Start with seven project inputs.

    Start with the complete lifting task: the item, any attachment and the space the hook must reach. Use the seven inputs below to give suppliers a common basis for their technical proposal and quotation.

    Project inputWhat to provideWhy it matters
    Load & attachmentHeaviest item, its dimensions and lifting points. List any sling, spreader, grab or magnet, including its weight.The suspended load and attachment arrangement affect capacity selection and hook clearance.
    Span & travelDistance between runway rail centres and the required travel length. Include a bay drawing if available.Building width alone does not identify the crane span or its coverage.
    Hook position & liftLowest and highest required hook positions, roof clearance and the highest obstruction.The crane must fit the building and reach the actual pick-up and set-down points.
    Working cycleLifts per hour, hours per shift, number of shifts and the proportion of heavy loads.Capacity alone does not describe how intensively the crane will work.
    Site conditionsIndoor or outdoor use; heat, dust, moisture, corrosion or other process conditions.The environment can change the required components and crane arrangement.
    Power & operationSite voltage, frequency and phase; pendant, radio or cabin control; any process interfaces.Electrical and operating requirements need to match the site.
    Delivery & site workProject location, target timing and who provides the runway, installation and commissioning.A useful quotation defines what is supplied and what must be arranged separately.

    Missing a number? Mark it “to be confirmed” and share the drawing or photo you do have. An explicit unknown is more useful than an assumed dimension.

    Measure the crane’s working space.

    Use three separate dimensions: span S, long travel L and required hook travel H. A marked-up workshop drawing helps everyone use the same reference points.

    Workshop plan showing span S and crane travel LSpan is measured between runway rail centre lines. Long travel runs along those rails. This sketch is not to scale.PLAN VIEWS · Rail centresL · Long travel
    S is the rail-centre span. Send the travel length separately. Add columns, walls and areas that the crane must reach to the plan.
    Workshop elevation showing hook travel H and roof clearanceRequired hook travel is the vertical distance between the highest and lowest needed hook positions. Roof clearance must be checked separately. This sketch is not to scale.ELEVATIONHHighest hookLowest hookH · Required hook travel
    Hook travel is not roof height. Show the required hook positions and roof level. The proposed crane’s headroom and clearances need a separate check.

    These sketches explain the measurement references; they are not installation drawings. For an existing building, also share runway details, column positions and any available structural drawings.

    Compare the arrangement, not capacity alone.

    Start with the lifting task, building support and working cycle. These three catalogue families illustrate different arrangements to discuss; their ranges are not a selection decision by themselves.

    1–20 tSpan 7.5–31.5 mWorking class A3

    A single-girder bridge arrangement. Compare the hoist headroom, hook approaches and runway loading with your bay drawing.

    3–20 tSpan 10.5–31.5 mWorking class A3–A4

    A double-girder electric-hoist arrangement. Request the specific model’s dimensional drawing and wheel loads before checking fit.

    0.5–10 tSpan 3–16 mWorking class A3–A5

    A suspended single-beam arrangement. Confirm the supporting structure, suspension points and required working coverage.

    Catalogue reference: Henan Mine Crane Product Selection Guide, model families LDA, LH and LX. LH nominal capacities are 3, 5, 10, 16 and 20 t. Available combinations depend on the selected model.

    Handling hot, magnetic or bulk material? Include the material and attachment details in your brief. A general hook-crane comparison will not capture every process requirement.

    Make every quotation cover the same scope.

    A lower total can mean a different boundary of supply. Ask suppliers to identify what is included, excluded or still provisional in each of the five areas below.

    Crane equipment
    Identify the bridge, hoist or trolley, drives, controls and lifting attachment. Ask for the model, working class, speeds and dimensional drawing.
    Runway & support
    Confirm responsibility for runway beams, rails, fixings and structural checks. Ask for the proposed crane’s wheel loads and rail requirements.
    Power supply
    Separate the crane’s electrical equipment from the building’s feed, isolator and long-travel conductor or cable system.
    Installation & handover
    Clarify supervision, site labour, access equipment, lifting equipment, testing, commissioning and operator handover.
    Delivery & support
    Agree the delivery point, packing, freight boundary, schedule, documentation, spare parts and warranty terms in the quotation.

    Turn your notes into a quotation brief.

    Enter what you know. Leave unknowns blank and the brief will mark them for confirmation. You can copy it for internal review or use it to start an enquiry with Henan Mine Crane.

    This tool prepares text in your browser. It does not submit an enquiry. No contact details are needed to use it.

    Before you send.

    Four common questions when preparing an overhead crane enquiry.

    Can I request a quotation without a finished drawing?

    Yes. Start with the load, approximate bay dimensions, photos and lifting task. Mark unverified dimensions clearly. The crane arrangement and building fit still need to be checked before an order is defined.

    Is the building’s inside width the crane span?

    No. For a rail-running overhead crane, span refers to the distance between the runway rail centres. Send the building drawing and support details if the rail positions have not been set.

    Does the same lifting capacity mean the same crane?

    No. Working cycle, lifting height, span, speeds, controls, attachments and site conditions can differ. Compare the proposed specification and supply scope as well as the nominal capacity.

    Which files help a supplier understand the project?

    A workshop plan, an elevation showing roof and runway levels, load photos or drawings, and a short description of a normal lifting cycle are useful. State which dimensions are confirmed and which are estimates.

    Continue your selection

    Explore the crane families.

    Compare product parameters and arrangements, then bring your shortlist and workshop details into the discussion.

    Browse overhead cranes
  • Taiyuan University of Science and Technology Delegation Visits Henan Mine Crane

    Taiyuan University of Science and Technology Delegation Visits Henan Mine Crane

    Company & People

    Taiyuan University of Science and Technology Delegation Visits Henan Mine Crane

    Henan Mine Crane welcomed 60 teachers and students from Taiyuan University of Science and Technology to its industrial park on 16 October 2026. The visit combined a tour of intelligent crane production with an introduction to the history of lifting equipment.

    University delegation walking beside a crane girder at Henan Mine Crane
    The group viewed crane structures during the production tour.

    Inside the production workshops

    The delegation toured the manufacturing workshops to see how crane production is organised and how intelligent equipment is used within the facility. The programme brought classroom engineering subjects into a working industrial environment.

    A visit to the China Crane Museum added a historical perspective, connecting present-day lifting equipment with earlier material-handling methods.

    Engineering education and industry exchange

    Henan Mine Crane maintains cooperation with universities and research institutions, including Taiyuan University of Science and Technology. Factory visits and technical exchanges provide a setting for students to examine manufacturing processes and discuss engineering applications.

    Arrange a crane factory review

    Share the crane type, intended application and topics you would like to review. Our team can discuss a factory visit and the project information needed for a crane proposal.

  • Henan Mine Crane and Yujian Group Discuss Inspection and Crane Research Cooperation

    Henan Mine Crane and Yujian Group Discuss Inspection and Crane Research Cooperation

    Industry & Partnerships

    Henan Mine Crane and Yujian Group Discuss Inspection and Crane Research Cooperation

    Henan Mine Crane and Henan Inspection and Testing Research Institute Group, known as Yujian Group, held a technical cooperation meeting on 16 October 2026. Discussions covered crane research, product quality, industrial development and standards.

    Henan Mine Crane and Yujian Group representatives in a technical meeting
    The meeting addressed research, product quality and standards cooperation.

    Research, quality and standards

    The two organisations explored how their technical resources could support crane research and product-quality work. Topics included research and development, transformation of manufacturing processes, and the preparation and revision of industry standards.

    The parties agreed to establish a regular communication mechanism to develop opportunities for cooperation. The visit included exchanges within the industrial park.

    Inspection requirements for a crane project

    Inspection scope should be defined alongside the crane configuration. A project enquiry can identify the required material records, fabrication inspections, operating tests and acceptance documents so that responsibilities are included in the technical proposal.

    Discuss your crane inspection scope

    Send the lifting requirements, destination and any project inspection specification. Henan Mine Crane can review the equipment arrangement and proposed documentation with your team.

  • Henan Mine Crane Presents Lifting Equipment in Guangzhou and Astana

    Henan Mine Crane Presents Lifting Equipment in Guangzhou and Astana

    Industry & Partnerships

    Henan Mine Crane Presents Lifting Equipment in Guangzhou and Astana

    Henan Mine Crane took part in international exhibitions in Guangzhou and Astana during October 2026. The displays brought lifting-equipment demonstrations and technical discussions to customers evaluating material-handling projects.

    Visitors viewing a crane demonstration at the Henan Mine Crane exhibition booth
    Demonstration equipment introduced the lifting arrangements to exhibition visitors.

    Equipment demonstrations in Guangzhou

    The 140th Canton Fair opened in Guangzhou on 15 October. Henan Mine Crane displayed electric transfer carts and crane demonstration equipment, giving visitors a practical starting point for discussions about lifting and transport arrangements.

    Transport and logistics applications in Astana

    The company also exhibited at the Kazakhstan international transport and logistics exhibition in Astana on 14–16 October. Discussions covered crane automation, digital systems and handling requirements.

    An exhibition discussion can be developed into a technical enquiry by providing the load, operating area, handling cycle and site layout. These inputs allow equipment arrangements to be compared against the intended application.

    Develop your lifting enquiry

    Send your application, lifting capacity, span, lifting height and site layout. Our team can discuss the configuration and the information needed for a project proposal.

  • World Standards Day 2026: Crane Design and Manufacturing

    World Standards Day 2026: Crane Design and Manufacturing

    Quality & Manufacturing

    World Standards Day 2026: Crane Design and Manufacturing

    Henan Mine Crane organised standards-awareness activities for World Standards Day on 14 October 2026. Displays across the industrial park highlighted the role of standards in crane design, manufacturing and industrial development.

    World Standards Day display at the Henan Mine Crane industrial park
    Company displays highlighted standards within industrial development.

    Standards within crane development

    The company participates in crane standardisation work, including the preparation and revision of standards across different levels. Its development activities cover lifting applications in sectors including aerospace, energy and industrial manufacturing.

    Define the applicable project requirements

    A crane enquiry should identify the destination, intended application and the design or inspection requirements specified by the owner. The agreed standard, edition, working duty and acceptance scope can then be recorded in the technical proposal.

    Clear requirements connect the equipment arrangement with the documents and tests required for the project.

    Discuss your crane specification

    Share the required crane arrangement, operating duty, destination and project standard. Our team can review the configuration and documentation scope.

  • Crane Batch Prepared for Export to a European Project

    Crane Batch Prepared for Export to a European Project

    Project Deliveries

    Crane Batch Prepared for Export to a European Project

    Henan Mine Crane held a dispatch ceremony on 11 October 2026 for a batch of cranes being exported to a project in Europe. The equipment was prepared for shipment in phases.

    Crane transport vehicles assembled at Henan Mine Crane for a European shipment
    The export batch was prepared for phased dispatch from the manufacturing base.

    A coordinated export dispatch

    Transport vehicles assembled at the manufacturing base for the departure ceremony. The crane batch forms part of the equipment supply for the European project.

    Phased dispatch requires the equipment list, packing identification and shipment sequence to be coordinated with receiving and assembly arrangements at the destination.

    Set the complete delivery scope

    For a comparable enquiry, define the crane configuration and the boundaries of supply together. Electrical requirements, delivery terms, transport dimensions, site access and installation responsibilities should be included in the project discussion.

    Plan your crane supply and shipment

    Send the lifting requirements, destination and intended supply scope. Our team can review the equipment arrangement and the dispatch information needed for your project.

  • Henan Mine Crane Manufacturing Visit Programme Receives Provincial Recognition

    Henan Mine Crane Manufacturing Visit Programme Receives Provincial Recognition

    Company & People

    Henan Mine Crane Manufacturing Visit Programme Receives Provincial Recognition

    Henan Mine Crane’s industrial-visit programme was included in Henan Province’s 2026 brand-experience listing. The programme brings together manufacturing facilities, intelligent production and science-education displays.

    Aerial view of the Henan Mine Crane manufacturing campus
    The manufacturing campus forms part of the industrial-visit setting.

    A view of the manufacturing process

    The visit programme presents crane development and manufacturing through the industrial park, production lines and exhibition areas. It also introduces the development of the regional lifting-equipment industry.

    The provincial listing was issued jointly by Henan’s development and reform and culture and tourism authorities.

    Prepare a factory review around your project

    A project-focused visit can concentrate on the crane configuration, fabrication stages, inspection records and assembly interfaces relevant to the order. Share the equipment requirements and review topics in advance so that the visit addresses your procurement priorities.

    Discuss a factory visit

    Tell us about your lifting application and the manufacturing or inspection topics you would like to review. Our team can discuss the proposed visit and project requirements.

  • Henan Mine Crane Resumes Fourth-Quarter Work After the October Holiday

    Henan Mine Crane Resumes Fourth-Quarter Work After the October Holiday

    Company & People

    Henan Mine Crane Resumes Fourth-Quarter Work After the October Holiday

    Henan Mine Crane resumed work after the National Day holiday on 8 October 2026. Employees gathered for a flag-raising ceremony as the company began its fourth-quarter work programme.

    Company teams gathered at the Henan Mine Crane industrial park
    The gathering marked the start of the fourth-quarter work programme.

    Quality and customer delivery priorities

    The company called on its teams to maintain attention to quality and customer requirements as work resumed. The gathering brought employees together at the industrial park.

    Coordinate the project schedule

    For a crane required within a particular delivery window, identify the drawing-approval milestones, inspection stages and site-readiness dates in the enquiry. Equipment release, transport and assembly activities can then be reviewed against the project sequence.

    Review your crane project schedule

    Share the lifting requirements, destination and intended installation window. Our team can discuss the technical approvals and supply scope needed to prepare a proposal.

  • 233 Staff Join Summer Safety Training and Emergency Drills

    233 Staff Join Summer Safety Training and Emergency Drills

    Quality & Manufacturing

    233 Staff Join Summer Safety Training and Emergency Drills

    Henan Mine Crane held a summer safety training and practical emergency drill programme on 16 June 2026, with 233 participants from departments and workshop teams.

    Practical first-aid demonstration during the training programme
    Practical first-aid demonstration during the training programme.

    Classroom preparation and practical exercises

    The programme combined instructor-led sessions on hot-weather awareness and basic emergency response with practical first-aid and fire-extinguisher exercises. Participants included workshop leaders, safety staff, quality inspectors and team members.

    Safety arrangements for manufacturing and site visits

    The company also described ongoing hazard reporting, equipment inspections and summer workplace management. For a factory inspection or installation visit, the site safety induction and access arrangements should be agreed with the host team in advance.

    Arrange a project or factory discussion

    Contact our team with your project scope, inspection purpose or proposed manufacturing visit.

  • Crane Manufacturers in China: How to Build an Engineering Shortlist

    Crane Manufacturers in China: How to Build an Engineering Shortlist

    Technical guide

    Crane Manufacturers in China: How to Build an Engineering Shortlist

    Compare manufacturers against the actual lifting task, engineering scope and support requirements. Model-specific drawings and an explicit supply boundary provide a stronger basis for a shortlist than an unsupported manufacturer ranking.

    Henan Mine CraneTechnical guide · Updated 2026Crane selection, project scope and operating requirements
    Henan Mine Crane overhead crane inside a workshop bay
    Henan Mine Crane overhead crane inside a workshop bay
    Project planning notes

    Key points for this crane project.

    1. Shortlist factories around the lifting job
    2. Make the manufacturing and engineering roles visible
    3. Review documents for the quoted configuration
    Read the technical guide

    Shortlist factories around the lifting job

    Begin with a description of the work the crane must perform. Include the complete suspended load, lifting attachment, pick-up and set-down positions and normal working cycle. A factory can then explain which of its arrangements it proposes and what information remains unresolved.

    Use that response to narrow the shortlist. The useful evidence is a proposal that addresses the job, identifies assumptions and shows the interfaces with the site. A catalogue containing a wide range of cranes does not show that a particular configuration fits the project.

    Make the manufacturing and engineering roles visible

    Ask who prepares the crane design, manufactures the main equipment and supplies the lifting mechanism and controls. Identify the party responsible for technical queries and configuration changes during the order.

    Where an export company or local contractor participates, record how its responsibilities connect with the manufacturer. The purchaser should know where drawings are approved, how deviations are resolved and who supplies the final equipment documents. Clear roles make different factory offers easier to assess.

    Review documents for the quoted configuration

    Request a dimensional drawing showing the crane envelope and useful hook positions. Obtain the proposed working duty, motion data and support reactions needed by the site engineering team. Confirm that model references and attachment information are consistent across the drawing and quotation.

    Separate confirmed values from preliminary assumptions. If a workshop survey or load verification is still needed, put it on the technical action list before production approval.

    Coordinate export supply with destination work

    Agree the delivery point and the boundary between packing, transport and work at the destination. Installation may require building checks, prepared runways, electrical connections, assembly resources and access that are outside the equipment order.

    List these interfaces explicitly and identify who provides each item. The delivery schedule should be coordinated with site readiness and the information required from the purchaser, rather than treated as a stand-alone factory commitment.

    Use a resolved proposal as the purchasing basis

    Compare the final equipment configuration, documents and supply scope before comparing totals. Keep optional components, provisional items and excluded site work visible in the offer.

    For handover, agree the inspection records, commissioning responsibilities, operating information and spare-parts identification that the site needs. A practical manufacturer comparison follows these project deliverables and their contractual owners; it does not depend on an unsupported order of brand names.

    Discuss the crane arrangement for your project.

    Compare manufacturers against the actual lifting task, engineering scope and support requirements. Model-specific drawings and an explicit supply boundary provide a stronger basis for a shortlist than an unsupported manufacturer ranking. Share the load, available drawings, working cycle and site conditions with Henan Mine Crane so the required configuration and supply boundary can be discussed.

    Related crane configurations

    Explore crane product families and technical parameters ↗

    Updated 2026 · Henan Mine Crane