Double Girder Truss Gantry Crane

Overhead Cranes / Henan Mine Crane

Double Girder Truss Gantry Crane

Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of large-span equipment, long installation period, high cost of overweight, poor wind resistance in the open air, and inaccurate positioning, and the equipment has passed ISO, CE, and FEM international certifications.

Lifting capacity5-50 t
Span12 – 30 m
Working classA3-A5

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration

Model MEH
Crane Type Truss Double Girder Gantry Crane
Rated Lifting Capacity 5-50 t
Span 12 – 30 m
Lifting Height 6 – 18 m
Working Duty A3-A5
Trolley Quantity 2
Drive System VFD Frequency Conversion
Assembly Type Sectional Bolted Assembly
Hoisting Speed 3 – 10 m/min
Travel Speed 15-40 m/min
Protection Level IP54
Power Supply 220-690V, 50/60Hz
Material High-Strength Q355B Steel
Application Construction Site, Precast Yard, Cargo Yard, Logistics Park

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Overhead Cranes

Workshop lifting, production lines and specialist steel handling.

Match the process

Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

Double Girder Truss Gantry CraneDouble Girder Truss Gantry CraneParameter table of double girder truss gantry crane

Selection considerations

Start with your operating conditions.

01

Load & lifting method

Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

02

Site & available space

Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

03

Duty & environment

State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

Configuration comparison

Compare related lifting arrangements.

Crane arrangement Handling configuration
Double Girder Truss Gantry Crane Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of large-span equipment, long…
Anode Carbon Block Stacking Crane A dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
Clean Explosion Proof Bridge Crane A lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
Double Girder Casting Crane A dedicated configuration for molten-metal ladles. The complete suspended load, process temperatures and metallurgical safety requirements govern selection.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

02

Installation & commissioning

Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

03

Maintenance & spares

Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a quotation?+

Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

Can the crane fit an existing building?+

The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

Does the proposal include installation?+

Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share your load, span, lifting height and operating conditions.