  • YX Metallurgical Bridge Crane

    YX Metallurgical Bridge Crane

    Overhead Cranes / Henan Mine Crane

    YX Metallurgical Bridge Crane

    A metallurgical arrangement for lifting and turning material boxes. Process interfaces and the required turnover sequence determine the configuration.

    Lifting capacity5t – 50t
    Span7.5m – 35m
    Working classA6 – A7
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5t – 50t
    Span7.5m – 35m
    Lifting height6m – 20m
    Working classA6 – A7
    Power supply380V/50Hz; 220-660V/50-60Hz
    ControlsPLC + HMI touch screen + WLK controller
    Lifting arrangementSingle/double trolley, bridge type

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    YX Metallurgical Bridge CraneA metallurgical arrangement for lifting and turning material boxes. Process interfaces and the required turnover sequence determine the configuration.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Double Girder Casting CraneA dedicated configuration for molten-metal ladles. The complete suspended load, process temperatures and metallurgical safety requirements govern selection.
    Double Girder Truss Gantry CraneDouble Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of…

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Three Trolley Electric Hoist Crane

    Three Trolley Electric Hoist Crane

    Overhead Cranes / Henan Mine Crane

    Three Trolley Electric Hoist Crane

    Multiple lifting points for long or large workpieces. Trolley spacing, load sharing and individual operating sequences form part of the lifting plan.

    Lifting capacity1 – 32 t
    Span7.5 – 31.5 m
    Working classA5 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity1 – 32 t
    Span7.5 – 31.5 m
    Lifting height6 – 30 m
    Working classA5 – A6
    Hoisting speed0.8/5 – 8/16 m/min
    Trolley travel5 – 25 m/min
    Crane travel10 – 30 m/min
    Power supply220-690V, 50/60Hz
    ControlsRemote Control + Cabin Control

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Three Trolley Electric Hoist CraneMultiple lifting points for long or large workpieces. Trolley spacing, load sharing and individual operating sequences form part of the lifting plan.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Clean Explosion Proof Bridge CraneA lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
    Container Overhead CraneA double-girder overhead arrangement for container transfer in a defined working area. Container size, spreader, clearance and operating layout require review.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Slab Handling Crane

    Slab Handling Crane

    Overhead Cranes / Henan Mine Crane

    Slab Handling Crane

    A configuration for moving and stacking steel slabs. Slab dimensions, temperature, lifting attachment and production cycle determine the equipment.

    Lifting capacity20t – 150t (50+50t standard)
    Span10m – 39m
    Working classA7 – A8
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity20t – 150t (50+50t standard)
    Span10m – 39m
    Lifting height5m – 23m
    Working classA7 – A8
    Hoisting speed1m/min – 8m/min
    Crane travel10m/min – 30m/min
    Power supply380V/50Hz; 220V-660V/60Hz
    ControlsPLC module + HMI touch screen + WLK master controller

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Slab Handling CraneA configuration for moving and stacking steel slabs. Slab dimensions, temperature, lifting attachment and production cycle determine the equipment.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Double Girder Casting CraneA dedicated configuration for molten-metal ladles. The complete suspended load, process temperatures and metallurgical safety requirements govern selection.
    Double Girder Truss Gantry CraneDouble Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of…

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Quenching Crane

    Quenching Crane

    Overhead Cranes / Henan Mine Crane

    Quenching Crane

    A process crane for moving heated workpieces through a quenching cycle. Immersion speed, workpiece geometry and the process sequence govern selection.

    Lifting capacity5t – 80t
    Span7.5m – 35m
    Working classA7 – A8
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5t – 80t
    Span7.5m – 35m
    Lifting height4m – 20m
    Working classA7 – A8
    Hoisting speed8m/min – 20m/min
    Trolley travel8m/min – 25m/min
    Crane travel10m/min – 30m/min
    Power supply380V/50Hz; 220V-660V/50Hz/60Hz
    ControlsManual control / PLC automatic control

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Quenching CraneA process crane for moving heated workpieces through a quenching cycle. Immersion speed, workpiece geometry and the process sequence govern selection.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Double Girder Casting CraneA dedicated configuration for molten-metal ladles. The complete suspended load, process temperatures and metallurgical safety requirements govern selection.
    Double Girder Truss Gantry CraneDouble Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of…

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Multi Support Double Girder Underhung Crane

    Multi Support Double Girder Underhung Crane

    Overhead Cranes / Henan Mine Crane

    Multi Support Double Girder Underhung Crane

    An underhung arrangement for wide working areas and large components. Building support positions, runway interfaces and load distribution shape the configuration.

    Lifting capacity3 – 40 t
    Span10 – 80 m
    Working classA3 – A5
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity3 – 40 t
    Span10 – 80 m
    Lifting height6 – 30 m
    Working classA3 – A5
    Hoisting speed0.5 – 16 m/min
    Trolley travel2 – 20 m/min
    Crane travel5 – 60 m/min
    Power supply220-690V, 50/60Hz
    ControlsWireless Remote / Cabin Control

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Multi Support Double Girder Underhung CraneAn underhung arrangement for wide working areas and large components. Building support positions, runway interfaces and load distribution shape the configuration.
    Double Girder Truss Gantry CraneDouble Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of…
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Clean Explosion Proof Bridge CraneA lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Intelligent Grab Overhead Crane

    Intelligent Grab Overhead Crane

    Overhead Cranes / Henan Mine Crane

    Intelligent Grab Overhead Crane

    A grab configuration for ore, coal, slag and other bulk materials. Grab volume, material density and the required handling cycle determine the lifting arrangement.

    Lifting capacity5 – 50 t
    Span10.5 – 31.5 m
    Working classA6 – A8
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5 – 50 t
    Span10.5 – 31.5 m
    Lifting height6 – 30 m
    Working classA6 – A8
    Hoisting speed30 – 49 m/min
    Trolley travel31 – 45 m/min
    Crane travel76 – 94 m/min
    Power supply220-690V, 50/60Hz
    ControlsRemote / Cabin / Unmanned Auto
    Lifting arrangementFour-Rope Mechanical Grab

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Intelligent Grab Overhead CraneA grab configuration for ore, coal, slag and other bulk materials. Grab volume, material density and the required handling cycle determine the lifting arrangement.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Clean Explosion Proof Bridge CraneA lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
    Container Overhead CraneA double-girder overhead arrangement for container transfer in a defined working area. Container size, spreader, clearance and operating layout require review.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Modular Electric Hoist Overhead Crane

    Modular Electric Hoist Overhead Crane

    Overhead Cranes / Henan Mine Crane

    Modular Electric Hoist Overhead Crane

    A compact electric-hoist configuration for production, equipment assembly and repeat handling. Motion control and the workshop interface are specified for the process.

    Lifting capacity1 – 32 t
    Span7.5 – 31.5 m
    Working classA5 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity1 – 32 t
    Span7.5 – 31.5 m
    Lifting height6–30 m
    Working classA5 – A6
    Hoisting speed0.8/5 – 8/16 m/min
    Power supply220-690V, 50/60Hz
    ControlsWireless Remote / Pendant Control

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Modular Electric Hoist Overhead CraneA compact electric-hoist configuration for production, equipment assembly and repeat handling. Motion control and the workshop interface are specified for the process.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Clean Explosion Proof Bridge CraneA lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
    Container Overhead CraneA double-girder overhead arrangement for container transfer in a defined working area. Container size, spreader, clearance and operating layout require review.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Dual Trolley Insulated Overhead Crane

    Dual Trolley Insulated Overhead Crane

    Overhead Cranes / Henan Mine Crane

    Dual Trolley Insulated Overhead Crane

    An insulated two-trolley configuration for special industrial conditions. Define the electrical isolation and separate or coordinated lifting requirements.

    Lifting capacity32/5+32/5t (
    Span10m – 35m
    Working classA4 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity32/5+32/5t (
    Span10m – 35m
    Lifting height6m – 30m
    Working classA4 – A6
    Hoisting speed0.8m/min – 10m/min
    Trolley travel8m/min – 25m/min
    Crane travel10m/min – 30m/min
    Power supply380V/50Hz; 220V-660V/60Hz
    ControlsCabin/ground handle/wireless remote

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Dual Trolley Insulated Overhead CraneAn insulated two-trolley configuration for special industrial conditions. Define the electrical isolation and separate or coordinated lifting requirements.
    Insulated Double Girder Travelling CraneAn insulated lifting arrangement for electrically demanding processes. Insulation positions, the handling device and the site electrical conditions require review.
    Double Girder Truss Gantry CraneDouble Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of…
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Grab and Hook Dual Purpose Crane

    Grab and Hook Dual Purpose Crane

    Overhead Cranes / Henan Mine Crane

    Grab and Hook Dual Purpose Crane

    A dual-purpose arrangement for bulk and unit loads. The hook, grab and changeover procedure are selected for the materials handled.

    Lifting capacity5 – 16 t
    Span10.5 – 31.5 m
    Working classA5 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5 – 16 t
    Span10.5 – 31.5 m
    Lifting height6 – 20 m
    Working classA5 – A6
    Hoisting speed15 – 40 m/min
    Trolley travel5 – 20 m/min
    Crane travel10 – 40 m/min
    Power supply220-690V, 50/60Hz
    ControlsWireless Remote / Cabin Control
    Lifting arrangementDetachable Hydraulic Grab

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Grab and Hook Dual Purpose CraneA dual-purpose arrangement for bulk and unit loads. The hook, grab and changeover procedure are selected for the materials handled.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Clean Explosion Proof Bridge CraneA lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
    Container Overhead CraneA double-girder overhead arrangement for container transfer in a defined working area. Container size, spreader, clearance and operating layout require review.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com
  • Galvanizing Process Overhead Crane

    Galvanizing Process Overhead Crane

    Overhead Cranes / Henan Mine Crane

    Galvanizing Process Overhead Crane

    A process configuration for a galvanizing workshop. Workpiece suspension, corrosive exposure, heat and line interfaces form part of the specification.

    Lifting capacity5 – 32 t
    Span10.5 – 31.5 m
    Working classA5 – A6
    Technical specifications

    Define the total suspended load, duty and site conditions for your project.

    Technical specifications

    Check the load.
    Plan the configuration.

    Parameters and equipment options are matched to the application and confirmed in the technical proposal.

    Discuss your configuration
    Capacity5 – 32 t
    Span10.5 – 31.5 m
    Lifting height6 – 24 m
    Working classA5 – A6
    Hoisting speed5 – 25 m/min
    Crane travel8 – 40 m/min
    Power supply220-690V, 50/60Hz
    ControlsWireless Remote / Cabin Control

    Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

    Application & operation

    Matched to the handling task.

    Overhead Cranes

    Workshop lifting, production lines and specialist steel handling.

    Match the process

    Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

    Selection considerations

    Start with your operating conditions.

    01

    Load & lifting method

    Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

    02

    Site & available space

    Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

    03

    Duty & environment

    State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

    Configuration comparison

    Compare related lifting arrangements.

    Crane arrangementHandling configuration
    Galvanizing Process Overhead CraneA process configuration for a galvanizing workshop. Workpiece suspension, corrosive exposure, heat and line interfaces form part of the specification.
    Anode Carbon Block Stacking CraneA dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
    Clean Explosion Proof Bridge CraneA lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
    Container Overhead CraneA double-girder overhead arrangement for container transfer in a defined working area. Container size, spreader, clearance and operating layout require review.

    Operating protection & lifecycle support

    Plan beyond the equipment.

    01

    Operating protection

    Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

    02

    Installation & commissioning

    Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

    03

    Maintenance & spares

    Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

    Questions before the order

    Clarify the details
    that shape the crane.

    What information is needed for a quotation?+

    Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

    Can the crane fit an existing building?+

    The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

    Does the proposal include installation?+

    Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

    Related equipment

    Explore the alternatives.

    Let’s discuss your project

    The right crane starts
    with your lifting task.

    Share your load, span, lifting height and operating conditions.

    info@hnksglobal.com