Gantry Cranes / Henan Mine Crane
Electromagnetic Hook Double Gantry Crane
Henan Mine Crane MEN is a double trolley + electromagnetic/hook dual mode heavy-duty transfer equipment specially designed for metallurgical steel mills, scrap recycling yards, port yards and heavy manufacturing workshops.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Model | MEN |
|---|---|
| Crane Type | General Double Girder Gantry Crane |
| Rated Lifting Capacity | 10-50 t |
| Span | 18-35 m |
| Lifting Height | 8 – 24 m |
| Working Duty | A3-A8 |
| Trolley Quantity | 2 |
| Lifting Device | Hook + Electromagnetic Magnet |
| Working Cycle | 80-100 |
| Control System | PLC + Touch Screen + WLK Controller |
| Hoisting Speed | 3 – 12 m/min |
| Travel Speed | 15-45 m/min |
| Protection Level | IP54 |
| Power Supply | 220-690V, 50/60Hz |
| Material | High-Strength Q355B Steel |
| Application | Steel Mill, Scrap Yard, Port, Outdoor Warehouse |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Gantry Cranes
Independent lifting systems for yards, fabrication and construction.
Match the process
Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.
Selection considerations
Start with your operating conditions.
Load & lifting method
Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.
Site & available space
Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.
Duty & environment
State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Electromagnetic Hook Double Gantry Crane | Henan Mine Crane MEN is a double trolley + electromagnetic/hook dual mode heavy-duty transfer equipment specially designed for metallurgical steel mills, scrap recycling yards,… |
| Double girder Electric Hoist gantry crane | Henan Mine Crane Double Main Girder Electric Hoist Gantry Crane is a heavy-duty general-purpose gantry crane developed in strict compliance with the… |
| Double girder gantry crane | Henan Mine Crane’s MG Double-Girder Gantry Crane features an integrated box-type double-girder + rigid outrigger structure. With lifting capacities… |
| European Single Girder Gantry Crane | Henan Mine Crane The new electric hoist gantry crane, using European-style electric hoist for the hoisting mechanism, supported by both sides of the… |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.
Installation & commissioning
Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.
Maintenance & spares
Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a quotation?+
Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.
Can the crane fit an existing building?+
The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.
Does the proposal include installation?+
Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share your load, span, lifting height and operating conditions.











