Overhead Cranes / Henan Mine Crane
Double Girder Truss Gantry Crane
Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of large-span equipment, long installation period, high cost of overweight, poor wind resistance in the open air, and inaccurate positioning, and the equipment has passed ISO, CE, and FEM international certifications.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Model | MEH |
|---|---|
| Crane Type | Truss Double Girder Gantry Crane |
| Rated Lifting Capacity | 5-50 t |
| Span | 12 – 30 m |
| Lifting Height | 6 – 18 m |
| Working Duty | A3-A5 |
| Trolley Quantity | 2 |
| Drive System | VFD Frequency Conversion |
| Assembly Type | Sectional Bolted Assembly |
| Hoisting Speed | 3 – 10 m/min |
| Travel Speed | 15-40 m/min |
| Protection Level | IP54 |
| Power Supply | 220-690V, 50/60Hz |
| Material | High-Strength Q355B Steel |
| Application | Construction Site, Precast Yard, Cargo Yard, Logistics Park |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Overhead Cranes
Workshop lifting, production lines and specialist steel handling.
Match the process
Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.
Selection considerations
Start with your operating conditions.
Load & lifting method
Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.
Site & available space
Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.
Duty & environment
State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Double Girder Truss Gantry Crane | Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of large-span equipment, long… |
| Anode Carbon Block Stacking Crane | A dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration. |
| Clean Explosion Proof Bridge Crane | A lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications. |
| Double Girder Casting Crane | A dedicated configuration for molten-metal ladles. The complete suspended load, process temperatures and metallurgical safety requirements govern selection. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.
Installation & commissioning
Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.
Maintenance & spares
Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a quotation?+
Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.
Can the crane fit an existing building?+
The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.
Does the proposal include installation?+
Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share your load, span, lifting height and operating conditions.




