Overhead Cranes / Henan Mine Crane
Dual Trolley Explosion Proof Bridge Crane
Combine two-trolley handling with the declared hazardous-area specification. Coordinate hook loads, lifting sequence, electrical protection and operator controls for the complete installation.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Capacity | 20+20t |
|---|---|
| Span | 10m – 35m |
| Lifting height | 6m – 30m |
| Working class | A4 – A6 |
| Hoisting speed | 1m/min – 8m/min |
| Trolley travel | 8m/min – 25m/min |
| Crane travel | 10m/min – 30m/min |
| Power supply | 380V/50Hz; 220V-660V/60Hz |
| Controls | Cabin/ground handle/wireless remote/PLC linkage |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Long hazardous-area loads
Coordinate two lifting points within a classified production bay.
Process equipment handling
Match the lifting arrangement to the equipment and surrounding hazardous conditions.
Selection considerations
Start with your operating conditions.
Load & lifting arrangement
Specify load at each hook and the intended combined lifting sequence. Include lifting-appliance weight and the required lifting positions.
Site & available space
Provide trolley spacing, runway positions and maintenance access. Coordinate the installation interfaces with the available site drawings.
Duty & control sequence
Define hazardous-area classification, temperature and control requirements. Identify the required movements and control interfaces in the enquiry.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Dual Trolley Explosion Proof Bridge Crane | Combine two-trolley handling with the declared hazardous-area specification. Coordinate hook loads, lifting sequence, electrical protection and operator controls for the complete installation. |
| Explosion-Proof Bridge Crane | Use a QB bridge crane for lifting in a declared explosive-gas environment. Select the load rating, main and auxiliary arrangement, electrical protection and control mode for the project. |
| Explosion Proof Electric Hoist Bridge Crane | Use an electric-hoist bridge arrangement for a declared hazardous area. The hoist, drives, controls and electrical installation are specified for the area classification and lifting duty. |
| Double Trolley Electric Hoist Crane | Lift long components or serve separate working positions with two electric-hoist trolleys on one bridge. Trolley spacing, load sharing and independent or coordinated operation are specified for the task. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.
Installation & commissioning
Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.
Inspection & spares
Plan inspection and maintenance of trolley interlocks, lifting mechanisms and protected electrical enclosures. Agree service access, documentation and the required spare-parts scope.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a dual trolley explosion proof bridge crane quotation?+
Provide load at each hook and the intended combined lifting sequence; trolley spacing, runway positions and maintenance access; and hazardous-area classification, temperature and control requirements. Include drawings and the project destination when available.
What must be reviewed for coordinated two-trolley operation?+
Provide hook loads, lifting-point spacing, the load centre of gravity and the hazardous-area classification. The proposal defines permitted operating combinations and the protection of each relevant component.
What installation and support scope should be agreed?+
Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share load at each hook and the intended combined lifting sequence, together with your site layout and operating cycle.






















