Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

Single-Girder Bridge Crane

Overhead Cranes / Henan Mine Crane

Single-Girder Bridge Crane

Use an LDA single-girder bridge and electric hoist for general workshop material handling. Select the lifting capacity, runway geometry and hoist duty around the building and load.

Lifting capacity1–20 t
Span7.5–31.5 m
Working classA3
Technical specifications

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration
ModelLDA
Lifting capacity1–20 t
Span7.5–31.5 m; according to the selected configuration
Lifting height6, 9, 12, 18, 24 or 30 m; capacity-dependent
Working classA3
Electric hoistCD₁ or MD₁
Hoisting speed1–5 t: 8 or 8/0.8 m/min; 10 t: 7 or 7/0.7 m/min
Trolley travel20 m/min
Crane travel20 or 30 m/min
Power supply380 V, 50 Hz, three phase
Wheel diameter270 mm for the listed 1–10 t arrangements
Track flange width37–70 mm for the listed 1–10 t arrangements

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Workshop production

Move components between manufacturing, storage and loading positions.

Equipment maintenance

Provide lifting coverage around fixed machinery and service areas.

Selection considerations

Start with your operating conditions.

01

Load & lifting arrangement

Specify complete suspended load, lifting accessory and required hook positions. Include lifting-appliance weight and the required lifting positions.

02

Site & available space

Provide runway centres, rail elevation, roof clearance and hook approach. Coordinate the installation interfaces with the available site drawings.

03

Duty & control sequence

Define daily lifting cycle, motion requirements and site power. Identify the required movements and control interfaces in the enquiry.

Configuration comparison

Compare related lifting arrangements.

Crane arrangementHandling configuration
Single-Girder Bridge CraneUse an LDA single-girder bridge and electric hoist for general workshop material handling. Select the lifting capacity, runway geometry and hoist duty around the building and load.
European-Style Electric Single Girder CraneHandle workshop components with a European-style single-girder crane and electric hoist. Match the compact lifting arrangement and movement control to the building and operating cycle.
Single-Beam Suspension CraneSuspend an LX single-girder crane from an approved overhead runway to cover workshop lifting positions. Building support, runway geometry and available hook height determine the installation.
LH Electric Hoist Double Girder CraneUse an LH double-girder bridge with an electric-hoist trolley for workshop lifting, assembly and maintenance. Match the hoist arrangement to the suspended load, hook travel and available building space.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

02

Installation & commissioning

Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

03

Inspection & spares

Plan inspection and maintenance of electric-hoist rope, hook assembly and bridge travel drives. Agree service access, documentation and the required spare-parts scope.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a single-girder bridge crane quotation?+

Provide complete suspended load, lifting accessory and required hook positions; runway centres, rail elevation, roof clearance and hook approach; and daily lifting cycle, motion requirements and site power. Include drawings and the project destination when available.

Which loads belong in the rated-capacity calculation?+

State the workpiece and all suspended lifting accessories. Select the crane and hoist arrangement for the complete declared lifting task and the required operating cycle.

What installation and support scope should be agreed?+

Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share complete suspended load, lifting accessory and required hook positions, together with your site layout and operating cycle.

info@hnksglobal.com