Overhead Cranes / Henan Mine Crane
European-style Electric Single Girder Crane
Henan Mine Crane self-developed new electric hoist, with vertical lifting, vertical and horizontal three-dimensional movement functions, can be realized in the general industrial operating environment, intermittent, repetitive loading and unloading of materials and handling, is the workshop materials transfer, equipment assembly, warehousing and lifting of…
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Rated Lifting Capacity | 1t – 10t |
|---|---|
| Span | 7.5m – 28.5m |
| Lifting Height | 6m – 20m |
| Working Class | A3 – A5 |
| Lifting Speed | 0.5-16m/min |
| Crane Travel Speed | 5-30m/min |
| Hoist Type | New type electric hoist |
| Control Mode | Ground handle / Wireless remote control |
| Power Supply | 380V/50Hz; 220V-660V/60Hz |
| Protection Level | IP55 |
| Working Temperature | -20℃ ~ 45℃ |
| Design Standard | European FEM standard + China national standard |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Overhead Cranes
Workshop lifting, production lines and specialist steel handling.
Match the process
Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.
Selection considerations
Start with your operating conditions.
Load & lifting method
Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.
Site & available space
Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.
Duty & environment
State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| European-style Electric Single Girder Crane | Henan Mine Crane self-developed new electric hoist, with vertical lifting, vertical and horizontal three-dimensional movement functions, can be realized in the general industrial… |
| Double Girder Truss Gantry Crane | Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of… |
| Dust-Proof Explosion-Proof Overhead Crane | Henan Mine Crane LXB dust explosion-proof electric suspension crane is designed for flour milling, metal grinding, plastics processing and other… |
| Electric single beam crane for low clearance | Henan Mine Crane LDZ type electric single girder grab crane is based on the standard electric single girder crane targeted at improving the design of… |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.
Installation & commissioning
Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.
Maintenance & spares
Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a quotation?+
Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.
Can the crane fit an existing building?+
The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.
Does the proposal include installation?+
Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share your load, span, lifting height and operating conditions.




