Side-Mounted Single-Girder Crane

Overhead Cranes / Henan Mine Crane

Side-Mounted Single-Girder Crane

Henan Mine Crane LDP Offset Electric Single Girder Crane is a small and light lifting equipment upgraded and improved on the basis of the traditional LD type electric single girder cranes, both vertical lifting and vertical and horizontal three-dimensional movement, can be realized in the general industrial operating environment of the intermittent,…

Lifting capacity1t – 10t
Span7.5m – 28.5m
Working classA3 – A5

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration

Rated Lifting Capacity 1t – 10t
Span 7.5m – 28.5m
Lifting Height 6m – 20m
Working Class A3 – A5
Lifting Speed 3.2m/min – 16m/min
Crane Travel Speed 20m/min – 30m/min
Hoist Type Fixed Electric Hoist
Control Mode Ground handle / Wireless remote control
Power Supply 380V/50Hz; 220V-660V/60Hz
Protection Level IP54
Working Temperature -20℃ ~ 40℃

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Overhead Cranes

Workshop lifting, production lines and specialist steel handling.

Match the process

Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

Side-Mounted Single-Girder CraneSide-Mounted Single-Girder Crane

Selection considerations

Start with your operating conditions.

01

Load & lifting method

Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

02

Site & available space

Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

03

Duty & environment

State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

Configuration comparison

Compare related lifting arrangements.

Crane arrangement Handling configuration
Side-Mounted Single-Girder Crane Henan Mine Crane LDP Offset Electric Single Girder Crane is a small and light lifting equipment upgraded and improved on the basis of the traditional LD type electric single…
Double Girder Truss Gantry Crane Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of…
Dust-Proof Explosion-Proof Overhead Crane Henan Mine Crane LXB dust explosion-proof electric suspension crane is designed for flour milling, metal grinding, plastics processing and other…
Electric single beam crane for low clearance Henan Mine Crane LDZ type electric single girder grab crane is based on the standard electric single girder crane targeted at improving the design of…

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

02

Installation & commissioning

Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

03

Maintenance & spares

Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a quotation?+

Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

Can the crane fit an existing building?+

The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

Does the proposal include installation?+

Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share your load, span, lifting height and operating conditions.