Overhead Cranes / Henan Mine Crane
Clean Explosion Proof Bridge Crane
Combine overhead lifting with the declared cleanliness and hazardous-area requirements. Specify particle-control expectations, process exposure and area classification for the complete lifting system.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Capacity | 1t – 32t |
|---|---|
| Span | 7.5m – 28.5m |
| Lifting height | 6m – 20m |
| Working class | A3 – A5 |
| Hoisting speed | 0.5m/min – 10m/min |
| Crane travel | 5m/min – 30m/min |
| Power supply | 380V/50Hz; 220V-660V/60Hz |
| Controls | Explosion-proof wireless remote / cabin control |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Controlled production areas
Coordinate lifting equipment with the process cleanliness specification.
Hazardous process handling
Match electrical equipment, control devices and installation details to the declared area.
Selection considerations
Start with your operating conditions.
Load & lifting arrangement
Specify load and the cleanliness or particle-release specification. Include lifting-appliance weight and the required lifting positions.
Site & available space
Provide building clearances, service access and cleanroom interfaces. Coordinate the installation interfaces with the available site drawings.
Duty & control sequence
Define area classification, gas or dust data and process temperature. Identify the required movements and control interfaces in the enquiry.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Clean Explosion Proof Bridge Crane | Combine overhead lifting with the declared cleanliness and hazardous-area requirements. Specify particle-control expectations, process exposure and area classification for the complete lifting system. |
| Explosion-Proof Bridge Crane | Use a QB bridge crane for lifting in a declared explosive-gas environment. Select the load rating, main and auxiliary arrangement, electrical protection and control mode for the project. |
| Explosion Proof Electric Hoist Bridge Crane | Use an electric-hoist bridge arrangement for a declared hazardous area. The hoist, drives, controls and electrical installation are specified for the area classification and lifting duty. |
| Explosion-Proof Suspended Overhead Crane | Provide suspended electric-hoist lifting within a declared hazardous area. Review the overhead support, lifting duty and protection of the hoist, travel drives and controls as one system. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.
Installation & commissioning
Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.
Inspection & spares
Plan inspection and maintenance of enclosures, sealing surfaces and accessible service points. Agree service access, documentation and the required spare-parts scope.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a clean explosion proof bridge crane quotation?+
Provide load and the cleanliness or particle-release specification; building clearances, service access and cleanroom interfaces; and area classification, gas or dust data and process temperature. Include drawings and the project destination when available.
Does a cleanroom requirement define the explosion-protection specification?+
Cleanliness and hazardous-area classification are separate inputs. Provide both so the equipment, materials and electrical configuration can be reviewed together.
What installation and support scope should be agreed?+
Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share load and the cleanliness or particle-release specification, together with your site layout and operating cycle.




