Overhead Cranes / Henan Mine Crane
Metallurgical Electric Single Girder Crane
Provide metallurgical lifting with an LDY single-girder crane and a matched metallurgical electric hoist. Define the hot-load duty, lifting appliance and thermal exposure for the complete arrangement.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Rated Lifting Capacity | 1t – 10t |
|---|---|
| Span | 7.5m – 28.5m |
| Lifting Height | 6m – 30m |
| Working Class | A6 – A7 |
| Lifting Speed | 3.2 – 16m/min |
| Travel Speed | 20 – 30m/min |
| Hoist Model | YHⅡ Type Metallurgical Electric Hoist |
| Protection Level | IP55 (IP67 optional) |
| Thermal exposure | Declare ambient temperature, radiant heat and the lifting-task exposure |
| Hazardous-area configuration | Matched to the declared area classification, material group and temperature requirements |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Foundry workstations
Coordinate lifting coverage around hot-material handling positions.
Process maintenance
Match the lifting appliance, operating access and local thermal conditions.
Selection considerations
Start with your operating conditions.
Load & lifting arrangement
Specify hot load, lifting-appliance weight and material temperature. Include lifting-appliance weight and the required lifting positions.
Site & available space
Provide runway span, hook positions and heat-source clearances. Coordinate the installation interfaces with the available site drawings.
Duty & control sequence
Define metallurgical duty, hoist requirements and protective functions. Identify the required movements and control interfaces in the enquiry.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Metallurgical Electric Single Girder Crane | Provide metallurgical lifting with an LDY single-girder crane and a matched metallurgical electric hoist. Define the hot-load duty, lifting appliance and thermal exposure for the complete arrangement. |
| Metallurgical Bridge Crane | Lift hot process loads with a YZD metallurgical bridge arrangement selected for the complete load and thermal conditions. Specify the lifting appliance, duty cycle and operating-protection requirements. |
| Double Girder Casting Crane | Lift and transfer molten-metal ladles with a YZ casting crane configured for the full suspended load and casting process. Review ladle interfaces, thermal exposure and the operating sequence together. |
| YX Metallurgical Bridge Crane | Lift and turn material boxes with a YX metallurgical crane arrangement. The box interface, centre of gravity, turnover sequence and thermal conditions determine the lifting system. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.
Installation & commissioning
Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.
Inspection & spares
Plan inspection and maintenance of metallurgical hoist components, brakes and thermal protection. Agree service access, documentation and the required spare-parts scope.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a metallurgical electric single girder crane quotation?+
Provide hot load, lifting-appliance weight and material temperature; runway span, hook positions and heat-source clearances; and metallurgical duty, hoist requirements and protective functions. Include drawings and the project destination when available.
Why must the lifting task be declared as metallurgical duty?+
Thermal exposure, load type and the handling sequence affect the hoist, brakes and protective provisions. Specify the complete process rather than only a nominal lifting capacity.
What installation and support scope should be agreed?+
Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share hot load, lifting-appliance weight and material temperature, together with your site layout and operating cycle.




