Gantry Cranes / Henan Mine Crane
Double Girder Truss Gantry Crane
Use a double-girder truss gantry for yard or construction handling with the lifting points specified for the load. Define trolley quantity, coordinated movements and the transport or assembly constraints.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Model | MEH |
|---|---|
| Crane Type | Truss Double Girder Gantry Crane |
| Rated Lifting Capacity | 5-50 t |
| Span | 12 – 30 m |
| Lifting Height | 6 – 18 m |
| Working Duty | A3-A5 |
| Trolley Quantity | 2 |
| Drive System | VFD Frequency Conversion |
| Assembly Type | Sectional Bolted Assembly |
| Hoisting Speed | 3 – 10 m/min |
| Travel Speed | 15-40 m/min |
| Protection Level | IP54 |
| Power Supply | 220-690V, 50/60Hz |
| Material | High-Strength Q355B Steel |
| Application | Construction Site, Precast Yard, Cargo Yard, Logistics Park |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Precast and construction yards
Handle long components between casting, storage and loading positions.
Large workpieces
Coordinate trolley spacing and suspended-load distribution for the handling task.
Selection considerations
Start with your operating conditions.
Load & lifting arrangement
Specify workpiece length, lifting points and load distribution. Include lifting-appliance weight and the required lifting positions.
Site & available space
Provide span, trolley spacing, rail layout and assembly access. Coordinate the installation interfaces with the available site drawings.
Duty & control sequence
Define individual or coordinated lifting and outdoor site conditions. Identify the required movements and control interfaces in the enquiry.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Double Girder Truss Gantry Crane | Use a double-girder truss gantry for yard or construction handling with the lifting points specified for the load. Define trolley quantity, coordinated movements and the transport or assembly constraints. |
| Truss Gantry Crane | Handle yard materials with a truss-structure gantry crane matched to the load and working area. Define lifting coverage, leg geometry and the transport or assembly arrangement for the site. |
| Double Girder Gantry Crane | Handle machinery, steelwork and other heavy loads with a double-girder gantry crane. The lifting mechanism, runway, legs and any cantilevers are selected for the complete yard operation. |
| Double Girder Electric Hoist Gantry Crane | Cover an outdoor handling area with a double-girder gantry and electric-hoist trolley. Select the load rating, leg geometry, cantilever arrangement and travel coverage around the yard layout. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Define travel limits, overload protection, traffic clearances and the outdoor operating limits for the proposed arrangement.
Installation & commissioning
Agree rail foundations, runway alignment, wheel-load interfaces, erection access, electrical connections and commissioning responsibilities.
Inspection & spares
Plan inspection and maintenance of truss joints, trolley mechanisms and coordinated-control devices. Agree service access, documentation and the required spare-parts scope.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a double girder truss gantry crane quotation?+
Provide workpiece length, lifting points and load distribution; span, trolley spacing, rail layout and assembly access; and individual or coordinated lifting and outdoor site conditions. Include drawings and the project destination when available.
Can two trolleys lift one component?+
Provide the lifting-point geometry, centre of gravity and intended movement sequence. Load sharing, permitted operating combinations and coordinated controls must be defined for the proposed arrangement.
What installation and support scope should be agreed?+
Agree rail foundations, runway alignment, wheel-load interfaces, erection access, electrical connections and commissioning responsibilities. Specify the documentation, training and spare-parts support needed for the project.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share workpiece length, lifting points and load distribution, together with your site layout and operating cycle.