Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

Multi-Point Suspension Crane

Overhead Cranes / Henan Mine Crane

Multi-Point Suspension Crane

Cover a wide working area with a multi-point suspended crane arrangement. Coordinate runway support positions, load distribution and travel geometry with the building structure.

Lifting capacity1t – 20t
Span10m – 60m
Working classA3 – A6
Technical specifications

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration
Rated Lifting Capacity1t – 20t
Applicable Span10m – 60m
Number of Suspension Supports3+ sets
Drive SystemThree-in-one drive system
Working ClassA3 – A6
Lifting Speed2m/min – 12m/min
Crane Travel Speed15m/min – 30m/min
Hoist TypeCustom electric hoist
Control ModeGround handle / Wireless remote control / Cabin control
Power Supply380V/50Hz; 220V-660V/60Hz
Protection LevelIP54 (IP65 optional)
Working Temperature-25℃ ~ 50℃
Structural FeatureModular assembly

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Wide workshop coverage

Arrange suspension points around available structural support lines.

Large components

Coordinate lifting coverage with assembly positions and equipment clearances.

Selection considerations

Start with your operating conditions.

01

Load & lifting arrangement

Specify load geometry, lifting attachment and hook coverage. Include lifting-appliance weight and the required lifting positions.

02

Site & available space

Provide support positions, runway sections and building reactions. Coordinate the installation interfaces with the available site drawings.

03

Duty & control sequence

Define load distribution, travel alignment and operating cycle. Identify the required movements and control interfaces in the enquiry.

Configuration comparison

Compare related lifting arrangements.

Crane arrangementHandling configuration
Multi-Point Suspension CraneCover a wide working area with a multi-point suspended crane arrangement. Coordinate runway support positions, load distribution and travel geometry with the building structure.
Multi Support Double Girder Underhung CraneUse a multi-support double-girder underhung arrangement for wide-span working areas and large components. The building supports, lifting coverage and load distribution are designed together.
Single-Beam Suspension CraneSuspend an LX single-girder crane from an approved overhead runway to cover workshop lifting positions. Building support, runway geometry and available hook height determine the installation.
European Style Electric Single Beam Suspended CraneUse a European-style electric-hoist suspension crane for overhead handling beneath a supported runway. Coordinate compact lifting geometry, travel control and building clearances with the workshop layout.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

02

Installation & commissioning

Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

03

Inspection & spares

Plan inspection and maintenance of suspension joints, runway contact surfaces and travel alignment. Agree service access, documentation and the required spare-parts scope.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a multi-point suspension crane quotation?+

Provide load geometry, lifting attachment and hook coverage; support positions, runway sections and building reactions; and load distribution, travel alignment and operating cycle. Include drawings and the project destination when available.

Why are all suspension positions needed before quotation?+

Each support position affects the crane geometry and reactions. Provide the structural grid and runway drawings so load distribution, travel alignment and clearances can be coordinated.

What installation and support scope should be agreed?+

Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share load geometry, lifting attachment and hook coverage, together with your site layout and operating cycle.

info@hnksglobal.com