Products & Technology
Automated Coke-Container Crane Enters Operation at a Coking Plant
Two automated coke-container cranes developed by Henan Mine Crane entered operation for an industrial coking customer in late 2024.

Automation for the handling sequence
The source describes inverter speed control, positioning, remote video monitoring and human-machine interaction. Centralised electrical control works with mechanical assistance to reduce sway. It does not provide a verified duty class, load rating, positioning tolerance or energy-saving percentage for a general product range.

Define the hot-process environment
A project specification should identify the complete suspended load and container geometry, heat exposure, process positions, operating cycle, power supply, control-room interface and manual recovery mode. Agree which interlocks, operating modes and positioning criteria are to be demonstrated at factory and site acceptance.

Discuss your lifting requirement
Send the container drawing, thermal conditions, site layout and handling cycle to review an automated crane configuration.
