Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

Ship-To-Shore Crane (STS)

Port Cranes / Henan Mine Crane

Ship-To-Shore Crane (STS)

Transfer containers between ship and quay with an STS crane selected for the berth and vessel envelope. Define the lifting-appliance arrangement, outreach, rail position and handling cycle.

Lifting capacity40-65 80-120 t
Boom outreach40-72 m
Working classA8
Technical specifications

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration
Rated Lifting Capacity40-65 80-120 t
Boom Outreach40-72 m
Lifting Height (Above Rail)25-45 m
Lifting Height (Below Rail)15-30 m
Hoisting Speed60-150 m/min
Trolley Speed120-240 m/min
Gantry Travel Speed20-45 m/min
Working ClassA8
Working Temperature-20 ~ +50
Protection ClassIP54/IP55
Control SystemPLC + VFD
Power Supply380-690V, 50/60Hz

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Container berths

Coordinate the spreader and boom envelope with the declared vessel range.

Quay transfer operations

Match trolley coverage and clearances to waterside and landside handling positions.

Selection considerations

Start with your operating conditions.

01

Load & lifting arrangement

Specify container sizes, spreader mode and gross suspended loads. Include lifting-appliance weight and the required lifting positions.

02

Site & available space

Provide vessel envelope, boom outreach, quay rails and clearances. Coordinate the installation interfaces with the available site drawings.

03

Duty & control sequence

Define handling cycle, operating winds and terminal control interfaces. Identify the required movements and control interfaces in the enquiry.

Configuration comparison

Compare related lifting arrangements.

Crane arrangementHandling configuration
Ship-To-Shore Crane (STS)Transfer containers between ship and quay with an STS crane selected for the berth and vessel envelope. Define the lifting-appliance arrangement, outreach, rail position and handling cycle.
Rail-Mounted Container Gantry CraneHandle containers along a fixed yard runway with a rail-mounted container gantry crane. Coordinate the spreader, stacking geometry, rail layout and transfer positions around the terminal operation.
Rubber Tyred Gantry (RTG)Use a rubber-tyred gantry for heavy handling where the operating layout requires a mobile tyre-supported arrangement. Define the load, steering modes, route and ground conditions for the project.
Portal Harbor CraneHandle cargo with a portal harbor crane configured for the working radius and lifting appliance. Define hook or grab operation, quay interfaces, outreach and the operating cycle.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Define the permitted load cases, operating limits, travel protection and lifting-appliance interlocks for the declared cargo-handling modes.

02

Installation & commissioning

Coordinate runway or pavement interfaces, operating clearances, power arrangements, assembly access and the terminal commissioning requirements.

03

Inspection & spares

Plan inspection and maintenance of boom and trolley mechanisms, spreader interlocks and quay travel equipment. Agree service access, documentation and the required spare-parts scope.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a ship-to-shore crane (sts) quotation?+

Provide container sizes, spreader mode and gross suspended loads; vessel envelope, boom outreach, quay rails and clearances; and handling cycle, operating winds and terminal control interfaces. Include drawings and the project destination when available.

How should STS lifting capacity be stated?+

Specify the container and spreader operating mode and whether the rating is stated under the spreader or includes the lifting appliance. Define any single, twin or other proposed handling modes separately.

What installation and support scope should be agreed?+

Coordinate runway or pavement interfaces, operating clearances, power arrangements, assembly access and the terminal commissioning requirements. Specify the documentation, training and spare-parts support needed for the project.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share container sizes, spreader mode and gross suspended loads, together with your site layout and operating cycle.

info@hnksglobal.com