Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

Rubber Tyred Gantry (RTG)

Port Cranes / Henan Mine Crane

Rubber Tyred Gantry (RTG)

Use a rubber-tyred gantry for heavy handling where the operating layout requires a mobile tyre-supported arrangement. Define the load, steering modes, route and ground conditions for the project.

Lifting capacity20t – 100t
Span5m – 30m
Working classA6 – A8
Technical specifications

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration
Rated Lifting Capacity20t – 100t
Span5m – 30m
Lifting Height6m – 30m
Lifting Speed0.5m/min – 6m/min
Travel Speed5m/min – 25m/min
Steering ModeStraight, lateral, diagonal, in-situ rotation
Working ClassA6 – A8
Protection LevelIP55 (IP65 optional)
Site operating conditionsDeclare climate, wind exposure and permitted operating limits for the proposed configuration

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Flexible handling areas

Coordinate travel and lifting positions within a defined operating area.

Heavy-component transfer

Match the gantry envelope, steering arrangement and lifting appliance to the cargo.

Selection considerations

Start with your operating conditions.

01

Load & lifting arrangement

Specify cargo dimensions, complete suspended load and lifting appliance. Include lifting-appliance weight and the required lifting positions.

02

Site & available space

Provide pavement capacity, route gradients, turning envelope and clearances. Coordinate the installation interfaces with the available site drawings.

03

Duty & control sequence

Define travel and lifting cycles, steering requirements and power arrangement. Identify the required movements and control interfaces in the enquiry.

Configuration comparison

Compare related lifting arrangements.

Crane arrangementHandling configuration
Rubber Tyred Gantry (RTG)Use a rubber-tyred gantry for heavy handling where the operating layout requires a mobile tyre-supported arrangement. Define the load, steering modes, route and ground conditions for the project.
Rail-Mounted Gantry (RMG)Use an RMG for container transfer along a fixed rail layout. Select the lifting arrangement, yard coverage and positioning controls from the container flow and stacking requirements.
Container Straddle CarrierMove containers between handling positions with a straddle carrier matched to the travel route and stacking layout. Define container load, ground conditions, clearance and the preferred drive system.
Double Girder Gantry CraneHandle machinery, steelwork and other heavy loads with a double-girder gantry crane. The lifting mechanism, runway, legs and any cantilevers are selected for the complete yard operation.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Define the permitted load cases, operating limits, travel protection and lifting-appliance interlocks for the declared cargo-handling modes.

02

Installation & commissioning

Coordinate runway or pavement interfaces, operating clearances, power arrangements, assembly access and the terminal commissioning requirements.

03

Inspection & spares

Plan inspection and maintenance of tyres, steering components and lifting mechanisms. Agree service access, documentation and the required spare-parts scope.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a rubber tyred gantry (rtg) quotation?+

Provide cargo dimensions, complete suspended load and lifting appliance; pavement capacity, route gradients, turning envelope and clearances; and travel and lifting cycles, steering requirements and power arrangement. Include drawings and the project destination when available.

Can the gantry travel anywhere on the site?+

The operating route must be reviewed for pavement loading, gradients, clearances and turning space. Provide the intended lifting and travelling load cases for the proposed vehicle arrangement.

What installation and support scope should be agreed?+

Coordinate runway or pavement interfaces, operating clearances, power arrangements, assembly access and the terminal commissioning requirements. Specify the documentation, training and spare-parts support needed for the project.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share cargo dimensions, complete suspended load and lifting appliance, together with your site layout and operating cycle.

info@hnksglobal.com