Port Cranes / Henan Mine Crane
Rubber Tyred Gantry (RTG)
Use a rubber-tyred gantry for heavy handling where the operating layout requires a mobile tyre-supported arrangement. Define the load, steering modes, route and ground conditions for the project.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
Discuss your configuration| Rated Lifting Capacity | 20t – 100t |
|---|---|
| Span | 5m – 30m |
| Lifting Height | 6m – 30m |
| Lifting Speed | 0.5m/min – 6m/min |
| Travel Speed | 5m/min – 25m/min |
| Steering Mode | Straight, lateral, diagonal, in-situ rotation |
| Working Class | A6 – A8 |
| Protection Level | IP55 (IP65 optional) |
| Site operating conditions | Declare climate, wind exposure and permitted operating limits for the proposed configuration |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Application & operation
Matched to the handling task.
Flexible handling areas
Coordinate travel and lifting positions within a defined operating area.
Heavy-component transfer
Match the gantry envelope, steering arrangement and lifting appliance to the cargo.
Selection considerations
Start with your operating conditions.
Load & lifting arrangement
Specify cargo dimensions, complete suspended load and lifting appliance. Include lifting-appliance weight and the required lifting positions.
Site & available space
Provide pavement capacity, route gradients, turning envelope and clearances. Coordinate the installation interfaces with the available site drawings.
Duty & control sequence
Define travel and lifting cycles, steering requirements and power arrangement. Identify the required movements and control interfaces in the enquiry.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Rubber Tyred Gantry (RTG) | Use a rubber-tyred gantry for heavy handling where the operating layout requires a mobile tyre-supported arrangement. Define the load, steering modes, route and ground conditions for the project. |
| Rail-Mounted Gantry (RMG) | Use an RMG for container transfer along a fixed rail layout. Select the lifting arrangement, yard coverage and positioning controls from the container flow and stacking requirements. |
| Container Straddle Carrier | Move containers between handling positions with a straddle carrier matched to the travel route and stacking layout. Define container load, ground conditions, clearance and the preferred drive system. |
| Double Girder Gantry Crane | Handle machinery, steelwork and other heavy loads with a double-girder gantry crane. The lifting mechanism, runway, legs and any cantilevers are selected for the complete yard operation. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Define the permitted load cases, operating limits, travel protection and lifting-appliance interlocks for the declared cargo-handling modes.
Installation & commissioning
Coordinate runway or pavement interfaces, operating clearances, power arrangements, assembly access and the terminal commissioning requirements.
Inspection & spares
Plan inspection and maintenance of tyres, steering components and lifting mechanisms. Agree service access, documentation and the required spare-parts scope.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a rubber tyred gantry (rtg) quotation?+
Provide cargo dimensions, complete suspended load and lifting appliance; pavement capacity, route gradients, turning envelope and clearances; and travel and lifting cycles, steering requirements and power arrangement. Include drawings and the project destination when available.
Can the gantry travel anywhere on the site?+
The operating route must be reviewed for pavement loading, gradients, clearances and turning space. Provide the intended lifting and travelling load cases for the proposed vehicle arrangement.
What installation and support scope should be agreed?+
Coordinate runway or pavement interfaces, operating clearances, power arrangements, assembly access and the terminal commissioning requirements. Specify the documentation, training and spare-parts support needed for the project.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share cargo dimensions, complete suspended load and lifting appliance, together with your site layout and operating cycle.




