Overhead Cranes / Henan Mine Crane
Insulated Bridge Crane
The QY insulated hook bridge crane manufactured by Henan Mine Crane is a specialized lifting device designed for high-current, high-temperature, and corrosive environments. By incorporating multiple insulation devices at critical points, it prevents electrical conduction that could endanger personnel and equipment safety.
Define the total suspended load, duty and site conditions for your project.
Technical specifications
Check the load.
Plan the configuration.
Parameters and equipment options are matched to the application and confirmed in the technical proposal.
| Rated Lifting Capacity | 32/5+32/5t (customizable) |
|---|---|
| Span | 10m – 35m |
| Lifting Height | 6m – 30m |
| Insulation Class | Class F (customizable to Class H) |
| Dual Trolley Core Technology | Encoder, CI card frequency converter |
| Control Mode | Cabin/ground handle/wireless remote |
| Working Class | A4 – A6 |
| Lifting Speed | 0.8m/min – 10m/min |
| Crane Travel Speed | 10m/min – 30m/min |
| Trolley Travel Speed | 8m/min – 25m/min |
| Insulation Protection | Insulation pad + insulation sleeve + insulation plate |
| Power Supply | 380V/50Hz; 220V-660V/60Hz |
| Protection Level | IP65 |
| Working Temperature | -25℃ ~ 120℃ |
| Structural Feature | Heavy-duty modular assembly |
Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.
Selection considerations
Start with your operating conditions.
Load & lifting method
Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.
Site & available space
Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.
Duty & environment
State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.
Configuration comparison
Compare related lifting arrangements.
| Crane arrangement | Handling configuration |
|---|---|
| Insulated Bridge Crane | The QY insulated hook bridge crane manufactured by Henan Mine Crane is a specialized lifting device designed for high-current, high-temperature, and corrosive environments. By… |
| Insulated Double Girder Travelling Crane | An insulated lifting arrangement for electrically demanding processes. Insulation positions, the handling device and the site electrical conditions require review. |
| Double Girder Truss Gantry Crane | Double Trolley Truss Gantry Crane perfectly solves the core pain points of global engineering customers, such as difficult transportation of… |
| Dual Trolley Insulated Overhead Crane | An insulated two-trolley configuration for special industrial conditions. Define the electrical isolation and separate or coordinated lifting requirements. |
Operating protection & lifecycle support
Plan beyond the equipment.
Operating protection
Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.
Installation & commissioning
Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.
Maintenance & spares
Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.
Questions before the order
Clarify the details
that shape the crane.
What information is needed for a quotation?+
Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.
Can the crane fit an existing building?+
The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.
Does the proposal include installation?+
Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.
Related equipment
Explore the alternatives.
Let’s discuss your project
The right crane starts
with your lifting task.
Share your load, span, lifting height and operating conditions.






