Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

LH Electric Hoist Double Girder Crane

Overhead Cranes / Henan Mine Crane

LH Electric Hoist Double Girder Crane

Use an LH double-girder bridge with an electric-hoist trolley for workshop lifting, assembly and maintenance. Match the hoist arrangement to the suspended load, hook travel and available building space.

Lifting capacity3, 5, 10, 16, 20 t
Span10.5–31.5 m
Working classA3–A4
Technical specifications

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration
Capacity3, 5, 10, 16, 20 t
Span10.5–31.5 m
Lifting height6, 9, 12 or 18 m
Working classA3–A4
Hoisting speed3.5–8 m/min; dual speed available
Trolley travel20 m/min
Crane travel20 m/min; 30 m/min on listed variants
Power supply380 V · 50 Hz · 3 phase
ControlsGround control
Lifting arrangementCD₁ / MD₁ / HC / HM electric hoist

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Machinery workshops

Lift and position components within a fixed overhead runway bay.

Maintenance and assembly

Coordinate hook coverage, hoist duty and access around the equipment being serviced.

Selection considerations

Start with your operating conditions.

01

Load & lifting arrangement

Specify workpiece weight, rigging and required hook positions. Include lifting-appliance weight and the required lifting positions.

02

Site & available space

Provide runway centres, rail elevation and roof clearance. Coordinate the installation interfaces with the available site drawings.

03

Duty & control sequence

Define daily lifts, load spectrum and hoisting speed requirements. Identify the required movements and control interfaces in the enquiry.

Configuration comparison

Compare related lifting arrangements.

Crane arrangementHandling configuration
LH Electric Hoist Double Girder CraneUse an LH double-girder bridge with an electric-hoist trolley for workshop lifting, assembly and maintenance. Match the hoist arrangement to the suspended load, hook travel and available building space.
Single-Girder Bridge CraneUse an LDA single-girder bridge and electric hoist for general workshop material handling. Select the lifting capacity, runway geometry and hoist duty around the building and load.
Modular Electric Hoist Overhead CraneUse a modular electric-hoist overhead crane for production, assembly and maintenance lifting. Select the hoist arrangement, hook coverage and movement control for the workshop and operating cycle.
Double Trolley Electric Hoist CraneLift long components or serve separate working positions with two electric-hoist trolleys on one bridge. Trolley spacing, load sharing and independent or coordinated operation are specified for the task.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Confirm overload protection, travel limits, brakes, emergency controls and the required process interlocks for the declared lifting task.

02

Installation & commissioning

Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery.

03

Inspection & spares

Plan inspection and maintenance of electric-hoist rope, trolley wheels and travel drives. Agree service access, documentation and the required spare-parts scope.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a lh electric hoist double girder crane quotation?+

Provide workpiece weight, rigging and required hook positions; runway centres, rail elevation and roof clearance; and daily lifts, load spectrum and hoisting speed requirements. Include drawings and the project destination when available.

What distinguishes an LH lifting arrangement?+

The lifting mechanism uses an electric hoist mounted with the double-girder trolley arrangement. Selection should confirm hoist duty, hook approach, building clearances and maintenance access.

What installation and support scope should be agreed?+

Agree runway reactions, structural interfaces, electrical connections, assembly, inspection and commissioning responsibilities before delivery. Specify the documentation, training and spare-parts support needed for the project.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share workpiece weight, rigging and required hook positions, together with your site layout and operating cycle.

info@hnksglobal.com