500 t Twin-Trolley Crane Installed for Offshore Wind Assembly

Front view of orange 500 t twin-trolley crane and hooks in the wind equipment hall

Project Deliveries

500 t Twin-Trolley Crane Installed for Offshore Wind Assembly

A Henan Mine Crane 500 t twin-trolley, double-girder overhead crane was installed and put into operation at an offshore wind equipment project. The company reported 43 crane units or equipment sets supplied for the project’s first phase.

Front view of orange 500 t twin-trolley crane and hooks in the wind equipment hall
Twin-trolley bridge crane and lifting hooks in the assembly building.

A heavy-lift crane within a larger package

The 500 t unit is one heavy-lift crane in a 43-unit first-phase package. The official photos show an orange double-girder crane in a large assembly building. The report does not state that every unit has a 500 t rating.

For wind components, calculate the full suspended weight including tooling and rigging, centre of gravity and lifting-point separation. Map the assembly sequence, work-bay width, runway geometry, hook height and the routes to storage or dispatch.

Twin-trolley coordination and control

The published configuration uses a lightweight hoist arrangement with high lift and automatic fast/slow speed selection. Multiple hooks can be synchronized, with electrical anti-sway and digital/video monitoring. These functions need project-specific settings and acceptance criteria.

Specify trolley spacing, allowable load share, synchronized modes, anti-sway operating conditions, speed envelopes and monitoring records before comparing quotations. Confirm which functions are included in each crane of the wider package.

Define the purchase and acceptance scope

Request a capacity schedule for all cranes, layout drawings, runway and building interface loads, control descriptions, inspection records, factory and on-site tests, and maintenance access. Distinguish crane supply from installation, commissioning and lifting-tool responsibilities.

Plan a Wind-Equipment Heavy Lift

Share component weights, lifting points, bay drawings, hook height and coordinated-lift requirements for a crane package proposal.