500 t Twin-Trolley Crane Installed for Offshore Wind Assembly
A Henan Mine Crane 500 t twin-trolley, double-girder overhead crane was installed and put into operation at an offshore wind equipment project. The company reported 43 crane units or equipment sets supplied for the project’s first phase.

A heavy-lift crane within a larger package
The 500 t unit is one heavy-lift crane in a 43-unit first-phase package. The official photos show an orange double-girder crane in a large assembly building. The report does not state that every unit has a 500 t rating.
For wind components, calculate the full suspended weight including tooling and rigging, centre of gravity and lifting-point separation. Map the assembly sequence, work-bay width, runway geometry, hook height and the routes to storage or dispatch.

Twin-trolley coordination and control
The published configuration uses a lightweight hoist arrangement with high lift and automatic fast/slow speed selection. Multiple hooks can be synchronized, with electrical anti-sway and digital/video monitoring. These functions need project-specific settings and acceptance criteria.
Specify trolley spacing, allowable load share, synchronized modes, anti-sway operating conditions, speed envelopes and monitoring records before comparing quotations. Confirm which functions are included in each crane of the wider package.
Define the purchase and acceptance scope
Request a capacity schedule for all cranes, layout drawings, runway and building interface loads, control descriptions, inspection records, factory and on-site tests, and maintenance access. Distinguish crane supply from installation, commissioning and lifting-tool responsibilities.
Plan a Wind-Equipment Heavy Lift
Share component weights, lifting points, bay drawings, hook height and coordinated-lift requirements for a crane package proposal.