Products & Technology
500 t Double-Girder Crane Enters Service on a Rail Construction Project
A 500 t double-girder crane from Henan Mine Crane entered service at a rail construction project in China, supporting the handling of heavy construction components.

Heavy lifting and controlled movement
The crane combines a lightweight structural design with variable-frequency control and high-lift operation. Coordinated multi-hook movement and electronic sway control support the positioning of heavy components in a complex construction environment.

Monitoring for site operation
The equipment includes digital monitoring and camera-based visibility for operational awareness. For a comparable application, the lifting study should define load geometry, hook spacing, synchronisation, lift path and the site’s humidity and dust conditions. Required performance and acceptance criteria belong in the project specification.
Review a heavy-lift application
Provide the component weight and dimensions, lifting points, hook travel, site drawing and operating environment for technical review.
