Engineering · Manufacturing · Project support
info@hnksglobal.comWhatsApp +86 18836207779 ↗

125 t Overhead Cranes Serve an Underground Pump Station

Orange 125 t-class overhead cranes inside an underground pump station cavern

Project Deliveries

125 t Overhead Cranes Serve an Underground Pump Station

Henan Mine Crane supplied multiple overhead cranes, including 125 t-class units, for equipment installation at an underground pump station in a major water project. The published configuration includes PLC and variable-frequency control, coordinated lifting functions and diagnostic monitoring.

Orange 125 t-class overhead cranes inside an underground pump station cavern
Overhead cranes installed above the underground pump-station work area.

Crane duty in an underground powerhouse

The cranes are intended for lifting pump-station units in a confined underground building. Site photographs show orange overhead cranes over the pump-station work area.

For a comparable project, identify the heaviest assembled unit and service component, rigging weight, lifting points and route. Provide the cavern cross-section, runway elevation, span, hook approaches, available headroom, access openings and future maintenance lifts.

Controls and coordinated lifts

The reported design uses PLC-to-variable-frequency-drive communication. Multiple lifting points can be controlled together with balance adjustment; the hoisting arrangement supports four-quadrant operation. A diagnostic system displays position and operating, protection and fault signals, with alarm and record functions.

Procurement documents should define the allowable load share, permitted speed differences, position tolerance, emergency stop behaviour and interlocks for each synchronized lift. Ask the supplier to show how the control system records tests and faults.

Documents to request before purchase

Request the general arrangement and runway loads, control and electrical schematics, lifting procedure, inspection and factory test scope, as well as installation and commissioning responsibilities. Confirm how equipment is transported into the cavern and how on-site load and functional tests will be witnessed.

Specify an Underground Pump-Station Crane

Send the component and rigging weights, lift route, cavern drawings, runway data and control requirements for an engineering proposal.