5 Ton Overhead Crane

Overhead Cranes / Henan Mine Crane

5 Ton Overhead Crane

Configure a 5 ton overhead crane for your workshop. Compare single-girder, double-girder, underhung and special-purpose designs from Henan Mine Crane.

Lifting capacity5 t / 5,000 kg
SpanProject-specific; confirm the distance between runway rail centerlines
Working classSelected from load spectrum, starts per hour, travel frequency and operating shifts

Define the total suspended load, duty and site conditions for your project.

Technical specifications

Check the load.
Plan the configuration.

Parameters and equipment options are matched to the application and confirmed in the technical proposal.

Discuss your configuration

Rated lifting capacity 5 t / 5,000 kg
Crane structure Single girder, double girder, underhung or special-purpose configuration
Hoisting arrangement Electric wire-rope hoist or project-specific trolley/mechanism
Span Project-specific; confirm the distance between runway rail centerlines
Lifting height Project-specific; confirm the required vertical hook travel and available headroom
Working duty Selected from load spectrum, starts per hour, travel frequency and operating shifts
Hoisting and travel speeds Single speed, dual speed or variable-frequency control according to process needs
Control method Pendant, radio remote, operator cabin or automated control as applicable
Power supply Matched to the destination country and facility power system
Operating environment Standard indoor, outdoor or specially engineered for the declared conditions

Final parameters, dimensions, wheel loads and supply scope follow the approved project specification.

Application & operation

Matched to the handling task.

Overhead Cranes

Workshop lifting, production lines and specialist steel handling.

Match the process

Define the material, handling method, load cycle and operating conditions to select the lifting arrangement.

Henan Mine Crane single-girder 5 ton overhead crane configurationHenan Mine Crane double-girder 5 ton bridge crane configurationHenan Mine Crane underhung 5 ton overhead crane inside a workshop

Selection considerations

Start with your operating conditions.

01

Load & lifting method

Specify the material, dimensions, weight, centre of gravity and lifting attachment. Include the attachment weight in the suspended load.

02

Site & available space

Confirm span, lifting height, travel coverage, headroom and obstructions. Share runway or building drawings when available.

03

Duty & environment

State operating hours, lifts per hour, travel distances, temperatures, control requirements and the site power supply.

Configuration comparison

Compare related lifting arrangements.

Crane arrangement Handling configuration
5 Ton Overhead Crane Configure a 5 ton overhead crane for your workshop. Compare single-girder, double-girder, underhung and special-purpose designs from Henan Mine Crane.
Anode Carbon Block Stacking Crane A dedicated arrangement for handling and stacking anode carbon blocks. Block geometry, grip arrangement and storage layout shape the configuration.
Clean Explosion Proof Bridge Crane A lifting arrangement for processes combining cleanliness and hazardous-area requirements. Provide the cleanroom and area-classification specifications.
Container Overhead Crane A double-girder overhead arrangement for container transfer in a defined working area. Container size, spreader, clearance and operating layout require review.

Operating protection & lifecycle support

Plan beyond the equipment.

01

Operating protection

Confirm the required overload protection, travel limits, brakes, emergency controls and any process-specific interlocks in the technical specification.

02

Installation & commissioning

Agree the runway interface, assembly, electrical connections, inspection and commissioning responsibilities before delivery.

03

Maintenance & spares

Define inspection access, maintenance documentation, wear parts and the support scope for the complete crane and lifting attachment.

Questions before the order

Clarify the details
that shape the crane.

What information is needed for a quotation?+

Provide the lifting task, maximum suspended load, span, lifting height, duty cycle, working environment, control mode and site power supply. A bay layout and material photos help define the configuration.

Can the crane fit an existing building?+

The existing runway, structural capacity, available headroom and clearances must be checked against the proposed crane dimensions and wheel loads.

Does the proposal include installation?+

Specify the destination and the installation support you need. Equipment supply, shipping, erection, commissioning and operator training should be defined separately in the proposal.

Related equipment

Explore the alternatives.

Let’s discuss your project

The right crane starts
with your lifting task.

Share your load, span, lifting height and operating conditions.